The Relativistic Heavy Ion Collider Run-17
  Polarized Protons Operation at 255 GeV with pp2pp

Gold-gold operation at 27.2 GeV/nucleon 

[STAR]  [PHENIX]   [Machine/Detector Planning]  
[Scheduling Physicist]   [Accelerator Physics Experiments]




Run-17 pp
E
GeV

255
Lpeak
1032cm-2s-1

1.5
Lavg
pb-1/week
50
Pavg %
55

[C-AD Broadcast]  [Ring Temperatures]  [Elogs]  [OC Elog]  [PPparameters (Gardner)]  [Configuration Control] [DryRun]  [Training Presentations]  [RHIC Runs overview]  [Accelerator Division]  [PPparametersAu (Gardner)]

RHIC
[PP Elog]  [Shift Leaders Schedule] [[Run Plan]  [Recipes]  [Plan of the Day]   [Polarimeter]  [Spin Patterns
[Speedbumps]  [Carbon CNI Analysis]  [Jet Analysis]  [Accelerator Performance Plots] [Morning Meeting]

[Au Elog [Plan of the Day]

AGS
[PP Elog]  [Shift Leaders Schedule]  [Run Plan]  [Recipes]



Main machine parameters (p+p)
Luminosity Leveling
No of bunches   STAR 100
Protons/bunch 2.2x1011
Blue Ramp working point Qx, Qy: (28.685,29.673)
Yellow Ramp working point Qx, Qy: (28.685,29.673)
Blue Store working point Qx, Qy: (28.695,29.685)
Yellow Store working point Qx, Qy: (28.695,29.685)
# of collisions
beta* for collisions 1.5 -0.9m @IP6
beta* for IP10 (e-lens) 15 m
beta* for all other IPS 7.5 m

Run projections

RHIC Status

RHIC 255 GeV PP Run Coordinator:

Vahid Ranjbar

vranjbar@bnl.gov

631-344-8218 (office)

Deputy:

Vincent Schoefer

schoefer@bnl.gov

631-344-8453 (office)

Run Coordinator (Au+Au):

Greg Marr

gmarr@bnl.gov

631-344-7810 (office)

AGS Run Coordinator:

Haixin Huang

huanghai@bnl.gov

631-344-5446 (office)