The Relativistic Heavy Ion Collider Run-15
  Polarized Protons Operation at 100 GeV with pp2pp


[STAR]  [PHENIX]   [Machine/Detector Planning]  
[Scheduling Physicist]   [Accelerator Physics Experiments]



Run-12
Run-15
E
GeV
100
100
Lpeak
1030cm-2s-1
46
115
Lavg
pb-1/week 9.3
25
Pavg % 59
57

[C-AD Broadcast]  [Ring Temperatures]  [Elogs]  [OC Elog]  [PPparameters (Gardner)]  [Configuration Control] [DryRun]  [Training Presentations]  [RHIC Runs overview]  [Accelerator Division]  [PPparametersAu (Gardner)]

RHIC
[PP Elog]  [Shift Leaders Schedule] [Dry Run Wiki] [Run Plan]  [Recipes]  [Plan of the Day]   [Polarimeter]  [Spin Patterns
[Speedbumps]  [Carbon CNI Analysis]  [Jet Analysis]  [Accelerator Performance Plots] [Morning Meeting]

AGS
[PP Elog]  [Shift Leaders Schedule]  [Run Plan]  [Recipes]



Main machine parameters Luminosity projection
No of bunches PHENIX 109 / STAR 100
Protons/bunch 2.3x1011
Blue Ramp working point Qx, Qy: (29.685,30.673)
Yellow Ramp working point Qx, Qy: (29.685,30.673)
Blue Store working point Qx, Qy: (29.695,30.685)
Yellow Store working point Qx, Qy: (29.695,30.685)
# of collisions 2
beta* for collisions 0.85 m @IP6& 8
beta* for IP10 (e-lens) 20 m
beta* for all other IPS 7.5 m

Run projections

RHIC Status

RHIC 100 GeV PP Run Coordinator operations:

Vincent Schoefer

schoefer@bnl.gov

631-344-8453 (office)

Deputy:

Haixin Huang

huanghai@bnl.gov

631-344-5446 (office)

AGS Run Coordinator:

Haixin Huang

huanghai

631-344-5446 (office)