AGS Ramp Polarization
Measurement on the Downramp Recipe
Haixin Huang huanghai@bnl.gov
June 5, 2009
Description:
This
recipe describes how to take the polarization ramp measurement on the downramp.
Process:
0. Ask Operation Support to replace the upGCC to downGCC from second floor cable room.
1. Open a xterm. type
ssh cnipol2 -l mcr
cd ado
cp new_set.ini.downramp new_set.ini
2. Switch PPM user to proper user (currently, AGS user4) on pet/AGS/Polarized_protons/CNI_target. The insertion and retraction time should be correct for this user already(Insertion: 1600000, Retraction: 250000). If not, change the insertion and extraction of target timing. Near the bottom, change the insertion "Delay from source" from 700000 to 1600000 (note how many zeroes!); change the extraction "Delay from source: from 1820000 to 2500000.
3. take a target scan to find target center. Use value 17500 as Center Position on the target scan page. Note: the peak position could be very different from flattop target center.
4 Change Num Events to 80 millions.
5.take ramp measurement. Do target scan after four or five measurements.
6. after the needed measurements done, reverse steps 1 and 2. namely:
change the insertion and extraction of target timing on pet/AGS/Polarized_protons/CNI_target. Near the bottom, change the insertion "Delay from source" from 1600000 to 700000; change the extraction "Delay from source: from 2500000 to 1820000.
7. Open a xterm. type
ssh cnipol2 -l mcr
cd ado
cp new_set.ini.flattop new_set.ini
8. change NUm Events to 40 millions
9. Ask Operation Support to replace the downGCC to upGCC from second floor cable room.
10. Switch PPM user back to user1 on pet/AGS/Polarized_protons/CNI_target.