Mode 1: 100 GeV/nucleon Au+Au
|
|
Start-Up Plan 100 GeV/nucleon
Machine Parameters
| No of bunches |
111 |
| Ions/bunch |
1.8x109 |
Blue Ramp WP
|
28.229 // 29.215 |
Yellow Ramp WP
|
28.229 // 29.215 |
Blue Store WP
|
28.229 // 29.215 |
Yellow Store WP
|
28.229 // 29.215 |
| No of collisions |
2
|
| initial beta* for collisions |
0.70 m @ IP6 & IP8
|
| beta* for IP2 & IP12 |
5.0 m |
| beta* for IP4 & IP10 |
free |
| pre-fire bump |
20 mm |
|
|
|
Mode 2: d-Au Energy Scan
|
|
Start-Up Plan d-Au Energy Scan
Machine Parameters
| No of bunches |
111 |
| Ions/bunch |
1.0x109 |
| Harmonic number |
360 |
| Voltage 28 MHz |
400 kV |
| Normalized RMS emittance |
2.5 mm.mrad |
| RMS bunch length |
2 m |
| Beam-Beam tune shift |
-0.003 |
| beta* for collisions |
3.5 m @ IP6 & IP8
|
|
|
|
|
RHIC Status
Start of RHIC cooldown to 4K: Jan. 19, 2016
Stochastic Cooling: all 3 planes available
56 MHz SC cavity: in the tunnel
d-Au Energy Scan:
first collisions on: TBD
reached STAR and PHENIX goals on TBD
100 GeV Energy Run:
started setup on 1/22, 2016 @ 08:00
declared physics with Fill (TBD): 111x111 bunches, (TBD) ions/bunch
|
|
|