| [RHIC Collider Projections, latest version] | |
| [RHIC summary table]
[RHIC
integrated LNN plot] [RHIC
time in store plot] [Hadron colliders peak luminosity plot]
|
|
| [AtR Test (FY1995)] [Sextant Test (FY1997)] [Run-0 (FY1999)] | |
| [Run-1 (FY2000)] [Run-2 (FY2001/02)] [Run-3 (FY2003)] [Run-4 (FY2004)] [Run-5 (FY2005)] | |
| [Run-6 (FY2006)] [Run-7 (FY2007)] [Run-8 (FY2008)] | |
| Fiscal
years start on 1 October. |
Data assembled by Wolfram Fischer. Last update: 18-April-2008. |
| RHIC operating modes and total integrated
luminosity delivered to 5 experiments |
|||||
| Run |
species |
total
particle energy [GeV/nucleon] |
time in physics |
total delivered luminosity |
average store polarization |
| Run-1 CY2000 FY2000 |
Au79+-Au79+ |
27.9 |
3
shifts |
< 0.001μb-1 | — |
| Au79+-Au79+ | 65.2 |
5.3
weeks |
20 μb-1 | — | |
| Run-2 CY2001/02 FY2001/02 |
Au79+-Au79+ | 100.0 |
15.9
weeks |
258 μb-1 | — |
| Au79+-Au79+ | 9.8 |
2
shifts |
0.4 μb-1 | — | |
| pol. p-p | 100.0 |
8.3
weeks total, no continous physics operation |
1.4 pb-1 | 14% |
|
| Run-3 CY2002/03 FY2003 |
d-Au79+ | 100.0 |
10.2
weeks |
73 nb-1 | — |
| pol. p-p | 100.0 |
9.0
weeks total, no continous physics operation |
5.5 pb-1 | 34% |
|
| Run-4 CY2003/04 FY2004 |
Au79+-Au79+ | 100.0 |
12.0
weeks |
3530 μb-1 | — |
| Au79+-Au79+ | 31.2 |
9
days |
67 μb-1 | — | |
| pol. p-p | 100.0 |
6.1
weeks total, no continous physics operation |
7.1 pb-1 | 46% |
|
| Run-5 CY2004/05 FY2005 |
Cu29+-Cu29+ | 100.0 |
7.8
weeks |
42.1 nb-1 | — |
| Cu29+-Cu29+ | 31.2 |
12
days |
1.5 nb-1 | — | |
| Cu29+-Cu29+ | 11.2 |
5
shifts |
0.02 nb-1 | — | |
| pol. p-p | 100.0 |
9.4
weeks |
29.5 pb-1 | 46% |
|
| pol. p-p | 204.9 |
2
stores |
0.1 pb-1 | 30% |
|
| Run-6 CY2006 FY2006 |
pol. p-p | 100.0 | 13.1
weeks |
88.6 pb-1 | 58% |
| pol. p-p | 31.2 | 12
days |
1.05 pb-1 | 50% |
|
| Run-7 CY2006/07 FY2006 |
Au79+-Au79+ | 100.0 |
12.8 weeks | 7250 μb-1 | — |
| Au79+-Au79+ | 4.6 |
3
shifts total, no continous physics operation |
test
only |
— | |
| Run-8 CY2007/08 FY2008 |
d-Au79+ | 100.0 | 9.0 weeks | 437 nb-1 | — |
| pol. p-p | 100.0 | 3.4
weeks |
38.4
pb-1
|
45% |
|
| Au79+-Au79+ | 4.6 | 3
shifts |
— | ||



| Run-8 CY2007/08 FY2008 |
Retreat at end of Run-8, 03/31/2008 - 04/02/2008, Montauk [Retreat web site] | ||||||
| Mode 3B: Au79+ on Au79+ at 2.5 GeV/nucleon particle energy [on Run-8 p-p web site] | |||||||
| Summary
paper: |
|||||||
| Beam operation: 03/11/2008 - 03/12/2008 (15 h) | |||||||
| Run Coordinator: Todd Satogata | |||||||
| Major accomplishments: stored some beam in Yellow ring with γ = 2.685, unbunched with peak intensity 0.05×109 and lifetime of 2 min, single bunch beam with peak intensity 0.01×109 and lifetime of 2 s, orbit correction very difficult | |||||||
| Mode 3A: Au79+ on Au79+ at 4.6 GeV/nucleon particle energy [on Run-8 p-p web site] | |||||||
| Summary
paper: |
|||||||
| Beam
operation: 03/10/2008 - 03/11/2008 (31 h) |
|||||||
| Run
Coordinator: Todd Satogata |
|||||||
| Major
accomplishments: STAR experiment collected a few thousand events for
physics |
|||||||
| Achieved
beam parameters: |
|||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [μb-1] |
|
| 56 |
0.4 |
10 |
40-60 |
3.5×1023 | 1.2×1023 | — | |
| γ injection: 4.931 | γ store: 4.931 | ||||||
| Time in
store: (very short run) |
|||||||
| Mode 2: polarized p on polarized p at 100.0 GeV particle energy [Run-8 p-p web site] | |||||||
| Summary
paper: |
|||||||
| Beam operation: 01/29/2008 - 03/10/2008 (41 days total, 24 days for physics) | |||||||
| Run Coordinator: Christoph Montag (AGS coordinator: Haixin Huang) | |||||||
| Major accomplishments: nonlinear chromaticity correction, tested near integer working point in Blue (not used in operation due to large 10 Hz orbit oscillations in triplets), tested β*= 65 cm (not used in operation) | |||||||
| Achieved
beam parameters: |
|||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 111 |
150 |
1.0 |
20-25 |
35×1030 | 23×1030 | 7.5 |
|
| Average
store polarization: 50% in Blue, 40% in Yellow |
|||||||
| γ
injection: 25.379 |
γ store:
106.813 |
||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β* [m] |
Luminosity [pb-1] | |||||
| PHENIX | 1.0 |
19.2 |
predominantly
ver. polarization |
||||
| STAR | 0.95 |
19.2 |
ver.
polarization |
||||
| Time in
store: 60% (no rotator ramps for most part of the run) |
|||||||
| Mode 1: d at 101.9 GeV/nucleon on Au79+ at 100.0 GeV/nucleon particle energy [Run-8 d-Au web site] | |||||||
| Summary
paper: |
|||||||
| Beam
operation: 11/08/2007 - 01/28/2008 (80 days total, 63 days for physics) |
|||||||
| Run
Coordinator: Christopher (Kip) Gardner |
|||||||
| Major
accomplishments: increased length of NEG coated beam pipes by 56 m (to
532 m total), kept machine at liquid nitrogen temperature
during the
summer shutdown again, Blue ring cool-down from 100K to 4K in 10 days,
Yellow in another 2 days, Yellow
ring lattice for gold beam with higher tunes to reduce IBS (Blue ring
has a bus problem that currently prevents higher tunes -- not critical
for deuterons), β* reduced to 0.85 m compared to 2 m in
Run-3, periodic orbit corrections in store introduced (every 1/2 hour) |
|||||||
| Achieved
beam parameters: |
|||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [nb-1] |
|
| 95 |
100d/1.0Au |
0.85 |
17-30 |
25×1028 | 12.5×1028 | 40 |
|
| γ
injection: 11.150 |
γ store:
107.396 |
||||||
| Total delivered integrated luminosities: | |||||||
| Experiment |
β* [m] |
Luminosity [nb-1] | Luminosity [rel. to Run-3] |
||||
| PHENIX |
0.85 |
238 |
9.8× | ||||
| STAR |
0.89 |
199 |
10.1× | ||||
| Time in
store: 58% |
|||||||
| Run-7 CY2006/07 FY2007 |
Retreat
at end of Run-7, 07/16/2007 - 07/17/2007, Two Trees Inn, Connecticut [Retreat
web site] |
||||||
| Mode 1B: Au79+ on Au79+ at 4.6 GeV/nucleon particle energy [Run-7 Au-Au web site] | |||||||
| Summary
paper: T. Satogata, L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J.J.
Butler, A. Drees, A.V. Fedotov, W. Fischer, M. Harvey, T. Hayes, W.
Jappe, R.C. Lee, W.W. MacKay, G.J. Marr, R. Michnoff, B. Oerter, E.
Pozdeyev, T. Roser, F. Severino, K. Smith, S. Tepikian, and N. Tsoupas,
"RHIC
challenges for low energy operations", proceedings of the 2007
Particle Accelerator Conference, Albuquerque, New Mexico (2007). |
|||||||
| Beam operation: 06/06/2007 - 06/07/2007 (24 h total) | |||||||
| Run Coordinator: Todd Satogata | |||||||
| Major
accomplishments: stored and collided Au beams at half the normal
injection energy, measured luminosity, a few hundred events recorded by
STAR |
|||||||
| Achieved
beam parameters: |
|||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [μb-1] |
|
| 56 |
0.4 |
10.0 |
40-60 |
4×1023 | 0.6×1023 | — | |
| γ injection: 4.931 | γ store:
4.931 |
||||||
| Time in
store: (test of low energy running) |
|||||||
| Mode 1A: Au79+ on Au79+ at 100.0 GeV/nucleon particle energy [Run-7 Au-Au web site] | |||||||
| Summary
paper: A. Drees, L. Ahrens, J. Alessi, M. Bai, D. Barton, J.
Beebe-Wang, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, J.J.
Butler, R. Calaga, P. Cameron, R. Connolly, T. D'Ottavio, W. Fischer,
W. Fu, G. Ganetis, J. Glenn, M. Harvey, T. Hayes, H.-C. Hseuh, H.
Huang, J. Kewisch, R.C. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, G.J.
Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, B. Oerter, F.C.
Pilat, V. Ptitsyn, T. Roser, J. Sandberg, T. Satogata, C. Schultheiss,
F. Severino, K. Smith, S. Tepikian, D. Trbojevic, N. Tsoupas, J.
Tuozzolo, A. Zaltsman, and S.Y. Zhang, "Summary of the RHIC performance during the
FY07 heavy ion run", proceedings of the 2007 Particle Accelerator
Conference, Albuquerque, New Mexico (2007). |
|||||||
| Beam
operation: 02/19/2007 - 06/26/07 (125 days
total, 90 days for physics, excluding 1 day for Mode 1B) |
|||||||
| Run
Coordinator: Angelika Drees |
|||||||
| Major
accomplishments: kept machine at liquid nitrogen temperature during the
summer shutdown, no DX training required, increased the total length of
NEG coated beam pipes in warm regions by 45 m to 475 m, horizontal
realignment in locations of large orbit corrector
strength, 8 sextupole families per ring for nonlinear chromaticity
correction (preparation for p, no operational benefit for Au),
AGS operation with Au31+ instead of Au32+ in
previous years (yields about 20% intensity gain), new BtA stripping
foil (Al+glassy carbon instead of carbon) reduces bunch area at AGS
injection from 0.40 eV.s/nucleon to 0.23 eV.s/nucleon, new AtR
stripping foil (W instead of Al oxide) reduces intensity loss by about
4%, start-up/ramp-up in 2
weeks (1/2 less than planned), first
use of beam scrubbing for operational purposes (2 hours at
injection to alleviate dynamic pressure rise at transition), first
operational use of orbit feedback at IP6 and IP8 (preparation for p, no
operational
benefit for Au), voltage dip from 300 kV to 150 kV at transition,
first operational use of stochastic cooling (in Yellow ring), NSRL and
AGS operation concurrent with entire RHIC run |
|||||||
| Achieved beam parameters (PHENIX/STAR): | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [μb-1] |
|
| 103 |
1.1 |
0.83/0.77 |
17-35 |
30×1026 | 12×1026 | 380 |
|
| γ injection: 10.520 | γ store: 107.396 | ||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β* [m] |
Luminosity [μb-1] | Luminosity [rel. to Run-4] |
||||
| PHENIX |
0.85 |
3270 |
2.6× |
||||
| STAR |
0.85 |
3100 |
2.6× |
||||
| MonoPole |
5.0 |
610 |
— | experimental
test apparatus
at IP2 |
|||
| IP10 |
5.0 |
270 |
— | test of
LHC luminostiy monitor at IP10 |
|||
| Time in
store: 48% |
|||||||
| Run-6 CY2005/06 FY2006 |
Retreat at end of Run-6, 07/10/2006 - 07/12/2006, Shelter Island [Retreat web site] | ||||||
| Mode 1D: polarized p on polarized p at 250.0 GeV particle energy [Run-6 p-p web site] | |||||||
| Summary paper: V. Ptitsyn, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J.M. Brennan, K.A. Brown, D. Bruno, G. Bunce, P. Cameron, R. Connolly, J. DeLong, T. D'Ottavio, A. Drees, A.V. Fedotov, W. Fischer, G. Ganetis, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, D.A. Kayran, J. Kewisch, R.C. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, Y. Makdisi, G.J. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, F.C. Pilat, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, D. Trbojevic, N. Tsoupas, J. Tuozzolo, A. Zaltsman, A. Zelenski, K. Zeno. and S.Y. Zhang, "RHIC performance as polarized proton collider in Run-6", proceedings of the 2006 European Particle Accelerator Conference, Edinburgh (2006). | |||||||
| Beam
operation: 06/20/06 - 06/26/06 (6 days total, no physics operation) |
|||||||
| Run Coordinator: Mei Bai (AGS coordinator: Haixin Huang) | |||||||
| Major
accomplishments: accelerated both beam to 250 GeV, 45% Blue beam
polarization at store (no colliding beams) |
|||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 28 |
90 |
1.5 |
25 |
— | — | — | |
| Average
store polarization: 45% in Blue, zero in Yellow |
|||||||
| γ injection: 25.379 | γ store:
266.477 |
||||||
| Mode 1C: polarized p on
polarized p at 31.2 GeV
particle energy [Run-6 p-p
web site] |
|||||||
| Summary paper: V. Ptitsyn, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J.M. Brennan, K.A. Brown, D. Bruno, G. Bunce, P. Cameron, R. Connolly, J. DeLong, T. D'Ottavio, A. Drees, A.V. Fedotov, W. Fischer, G. Ganetis, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, D.A. Kayran, J. Kewisch, R.C. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, Y. Makdisi, G.J. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, F.C. Pilat, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, D. Trbojevic, N. Tsoupas, J. Tuozzolo, A. Zaltsman, A. Zelenski, K. Zeno. and S.Y. Zhang, "RHIC performance as polarized proton collider in Run-6", proceedings of the 2006 European Particle Accelerator Conference, Edinburgh (2006). | |||||||
| Beam
operation: 06/05/06 - 06/20/06 (15 days total, 12 days for physics) |
|||||||
| Run Coordinator: Vadim Ptitsyn (AGS coordinator: Haixin Huang) | |||||||
| Major
accomplishments: first use of spin rotators at low energy |
|||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 111 |
90 |
3.0 |
20-30 |
2×1030 | 1×1030 | 0.22 |
|
| Average store polarization: 50% in Blue, 49% in Yellow | |||||||
| γ
injection: 25.379 |
γ store: 33.253 | ||||||
| Total
delivered integrated luminosities: |
|||||||
| Experiment | β*
[m] |
Luminosity [pb-1] | |||||
| PHENIX |
3.0 |
0.380 |
vertical
and longitudinal polarization (about 50% each) |
||||
| STAR |
3.0 |
0.325 |
vertical polarization | ||||
| BRAHMS |
3.0 |
0.340 |
vertical
polarization |
||||
| Time in
store: 50% |
|||||||
| Mode 1B: p on p at 11.25 GeV particle energy [Run-6 p-p web site] | |||||||
| Summary paper: V. Ptitsyn, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J.M. Brennan, K.A. Brown, D. Bruno, G. Bunce, P. Cameron, R. Connolly, J. DeLong, T. D'Ottavio, A. Drees, A.V. Fedotov, W. Fischer, G. Ganetis, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, D.A. Kayran, J. Kewisch, R.C. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, Y. Makdisi, G.J. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, F.C. Pilat, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, D. Trbojevic, N. Tsoupas, J. Tuozzolo, A. Zaltsman, A. Zelenski, K. Zeno. and S.Y. Zhang, "RHIC performance as polarized proton collider in Run-6", proceedings of the 2006 European Particle Accelerator Conference, Edinburgh (2006). | |||||||
| Beam
operation: 06/05/06 - 06/06/06 (25 h total) |
|||||||
| Run
Coordinator: Todd Satogata |
|||||||
| Major
accomplishments: first injection, storage and collision of beams with
rigidity of approximately half the normal injection rigidity |
|||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 28 |
75 |
10 |
30 |
1.7×1028 | 0.6×1028 | -- |
|
| Average
store
polarization: 41% in Blue, 32% in Yellow |
|||||||
| γ
injection: 11.99 |
γ store:
11.99 |
||||||
| Time in
store: (test for low energy ion collisions) |
|||||||
| Mode 1A: polarized p on
polarized p at 100.0 GeV
particle energy [Run-6 p-p
web site] |
|||||||
| Summary
paper: V. Ptitsyn, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, A.
Bravar, J.M. Brennan, K.A. Brown, D. Bruno, G. Bunce, P. Cameron, R.
Connolly, J. DeLong, T. D'Ottavio, A. Drees, A.V. Fedotov, W. Fischer,
G. Ganetis, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, D.A. Kayran,
J. Kewisch, R.C. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, Y. Makdisi,
G.J. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti,
B. Oerter, F.C. Pilat, T. Roser, T. Russo, J. Sandberg, T. Satogata, C.
Schultheiss, S. Tepikian, D. Trbojevic, N. Tsoupas, J. Tuozzolo, A.
Zaltsman, A. Zelenski, K. Zeno. and S.Y. Zhang, "RHIC
performance as polarized proton collider in Run-6",
proceedings of the 2006 European Particle Accelerator Conference,
Edinburgh (2006). |
|||||||
| Beam
operation: 02/07/06 - 06/05/06 (119 days total, 92 days for
physics) |
|||||||
| Run Coordinator: Vadim Ptitsyn (AGS coordinator: Haixin Huang) | |||||||
| Major
accomplishments: total of 430 m of NEG coated beam pipes installed in
warm
regions, pre-pumping in arcs lowered pressure to 10-6 - 10-7
Torr before cool-down, complete vertical re-alignment of both RHIC
rings, STAR shielding
installed, lowered injection energy to allow for better spin matching
with the AGS cold snake, first operational use of the AGS cold snake,
cool-down from 80 K to 4 K in 11 days (3 days less than planned), use
of
combined tune and coupling feedback for ramp development Major disruption: machine was off for one week following an arc flash incident in a switch of the STAR magnet electrical system |
|||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 111 |
135 |
1.0 |
18-23 |
28×1030 | 18×1030 |
6.5 |
|
| Average
store polarization: 60% in Blue and Yellow |
|||||||
| γ injection: 25.379 | γ store: 106.597 | ||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β*
[m] |
Luminosity [pb-1] | Luminosity [rel. to Run-5] |
||||
| PHENIX | 1.0 |
43.6 |
3.6× |
hor.
and long. polarization recorded number of 45.9 pb-1 reduced by 5% after Run-8 to account for singel accidentals |
|||
| STAR | 1.0 |
44.9 |
3.7× |
hor.
and long. polarization ecorded number of 47.3 pb-1 reduced by 5% after Run-8 to account for singel accidentals |
|||
| BRAHMS |
10.0 |
0.1 |
ver.
polarization, for Mode 1B preparation |
||||
| Time in
store: 46% (50% excluding 1 week of downtime due to an arc flash
incident) |
|||||||
| Run-5 CY2004/05 FY2005 |
Retreat at end of Run-5, 06/15/2005 - 06/17/2005, Shelter Island [Retreat web site] | ||||||
| Mode 2B: polarized p on polarized p at 204.9 GeV particle energy [Run-5 p-p web site] | |||||||
| Summary
paper: M. Bai, T. Roser, L. Ahrens, I. G. Alekseev, J. Alessi, J.
Beebe-Wang, M. Blaskiewicz, A. Bravar, J. M. Brennan, D. Bruno, G.
Bunce, E. Courant, A. Drees, W. Fischer, C. Gardner, R. Gill, J. Glenn,
W. Haeberli, H. Huang, O. Jinnouchi, J. Kewisch, A. Luccio, Y. Luo, I.
Nakagawa, H. Okada, F. Pilat, W. W. MacKay, Y. Makdisi, C. Montag, V.
Ptitsyn, T. Satgata, E. Stephenson, D. Svirida, S. Tepikian, D.
Trbojevic, N. Tsoupas, T. Wise, A. Zelenski, K. Zeno, and S. Y. Zhang, "Polarized
proton collisions at 205 GeV at RHIC", Phys. Rev. Lett. 96, 174801
(2006). |
|||||||
| Beam
operation: 05/31/05 - 06/03/05 (4 days total, 2 stores for physics -
primarily for PHOBOS) |
|||||||
| Run Coordinator: Mei Bai | |||||||
| Major
accomplishments: ramp setup for higher energy in 3 days, first
acceleration and storage of polarized protons
beyond 100 GeV |
|||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 56 |
60 |
2.0 |
25-50 |
3×1030 | 1.5×1030 | 0.5 |
|
| Average
store polarization: 30% |
|||||||
| γ injection: 25.936 | γ store: 218.368 | ||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β*
[m] |
Luminosity [pb-1] | |||||
| PHENIX | 2.0 |
0.05 |
|||||
| STAR | 2.0 |
0.05 |
|||||
| PHOBOS | 10.0 |
0.01 |
|||||
| Time in
store: (only 2 consecutive stores) |
|||||||
| Mode 2A: polarized p on polarized p at 100.0 GeV particle energy [Run-5 p-p web site] | |||||||
| Summary
paper: M. Bai, L. Ahrens, J. Alessi, J. Beebe-Wang, M. Blaskiewicz, A.
Bravar, J.M. Brennan, D. Bruno, G. Bunce, J. Butler, P. Cameron, R.
Connolly, J. DeLong, T. D'Ottavio, A. Drees, W. Fischer, G. Ganetis,
C.J. Gardner, J. Glenn, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia,
U. Iriso, J.S. Laster, R.C. Lee, A.U. Luccio, Y. Luo, W.W. MacKay, Y.
Makdisi, G.J. Marr, A. Marusic, G. McIntyre, R. Michnoff, C. Montag, J.
Morris, T. Nicoletti, P. Oddo, J. Osamu, F.C. Pilat, V. Ptitsyn, T.
Roser, T. Satogata, K. Smith, S. Tepikian, R. Tomas, D. Trbojevic, N.
Tsoupas, J. Tuozzolo, K. Vetter, M. Wilinski, A. Zaltsman, A. Zelenski,
K. Zeno, S.Y. Zhang, I.G. Alekseev, and D. Svirida, "Polarized
proton collisions at RHIC", proceedings of the 2005 Particle
Accelerator Conference, Knoxville, Tennessee (2005). |
|||||||
| Beam
operation: 03/25/05 - 06/24/05 (66 days for physics, excluding 05/31/05
-
06/03/05 for Mode 2B) |
|||||||
| Run
Coordinator: Mei Bai (AGS coordinator: Haixin Huang) |
|||||||
| Major
accomplishments: polarized source upgraded with new superconducting
solenoid, 60% polarization at AGS extraction, first acceleration of
polarized protons in AGS with cold snake (1011 protons per
bunch, 50% polarization at AGS extraction) - not yet used for physics,
3 weeks of set-up and ramp-up, operation with up to 111 bunches per
ring, increased store polarization by 5%, more calibration data with
H-jet, 56% of calendar time in store |
|||||||
| Achieved
beam parameters: |
|||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 106 |
90 |
1.0 |
30-35 |
10×1030 | 7×1030 | 1.9 |
|
| Average store polarization: 49% in Blue, 44%
in Yellow |
|||||||
| γ
injection: 25.936 |
γ store:
106.597 |
||||||
| Total delivered integrated luminosities: | |||||||
| Experiment |
β*
[m] |
Luminosity [pb-1]* | |||||
| PHENIX | 1.0 |
12.6
(0.65) |
|||||
| STAR |
1.0 |
12.7
(0.66) |
|||||
| BRAHMS |
3.0 |
4.2 (0.19) |
|||||
| *Amount
in brackets denotes delivered luminosity with vertical polarization,
the remainder was delivered with longitudinal polarization. |
|||||||
| Time in store: 56% of calendar time (run average for physics operation) | |||||||
| Mode 1C: Cu29+ on Cu29+ at 11.2 GeV/nucleon particle energy [Run-5 Cu-Cu web site] | |||||||
| Summary paper: F. Pilat, L. Ahrens, M. Bai, D.S. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, P. Cameron, R. Connolly, J. DeLong, T. D'Otavio, A. Drees, W. Fischer, G. Ganetis, C. Gardner, J. Glenn, P. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, G. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, A. Nicoletti, B. Oerter, V. Ptitsyn, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J. Tuozzolo, K. Vetter, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang, "Operations and performance of RHIC as a Cu-Cu collider", proceedings of the 2005 Particle Accelerator Conference, Knoxville, Tennessee (2005). | |||||||
| Beam
operation: 03/22/05 - 03/24/05 (42 hours total, 39 hours for physics) |
|||||||
| Run Coordinator: Fulvia Pilat | |||||||
| Major accomplishments: 82% of calendar time in store (at reduced bunch intensity, large emittance, and luminosity lifetime of about 0.5h) | |||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [nb-1] |
|
| 56 |
3.8 |
3.0 |
50-50 |
2.5×1026
|
0.5×1026
|
0.02 |
|
| γ injection: 12.075 | γ store: 12.075 | ||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β*
[m] |
Luminosity [nb-1] | |||||
| PHENIX | 3.0 |
0.006 |
|||||
| STAR | 3.0 |
0.006 |
|||||
| BRAHMS | 3.0 |
0.002 |
|||||
| PHOBOS | 3.0 |
0.004 |
|||||
| Time in store: 82% of calendar time (run average for physics operation) | |||||||
| Mode 1B: Cu29+ on Cu29+ at 31.2 GeV/nucleon particle energy [Run-5 Cu-Cu web site] | |||||||
| Summary paper: F. Pilat, L. Ahrens, M. Bai, D.S. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, P. Cameron, R. Connolly, J. DeLong, T. D'Otavio, A. Drees, W. Fischer, G. Ganetis, C. Gardner, J. Glenn, P. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, G. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, A. Nicoletti, B. Oerter, V. Ptitsyn, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J. Tuozzolo, K. Vetter, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang, "Operations and performance of RHIC as a Cu-Cu collider", proceedings of the 2005 Particle Accelerator Conference, Knoxville, Tennessee (2005). | |||||||
| Beam
operation: 03/07/05 - 03/22/05 (15 days total, 12 days for physics) |
|||||||
| Run Coordinator: Fulvia Pilat | |||||||
| Major accomplishments: 74% of calendar time in store (at reduced bunch intensity) | |||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [nb-1] |
|
| 42 |
3.1 |
3.0 |
15-30 |
0.10×1028 | 0.08×1028 | 0.28 |
|
| γ injection: 12.075 | γ store:
33.540 |
||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β*
[m] |
Luminosity [nb-1] | |||||
| PHENIX | 3.0 |
0.52 |
|||||
| STAR | 3.0 |
0.47 |
|||||
| BRAHMS | 5.0 |
0.30 |
|||||
| PHOBOS | 5.0 |
0.25 |
|||||
| Time in store: 74% of calendar time (run average for physics operation) | |||||||
| Mode 1A: Cu29+
on Cu29+ at
100.0 GeV/nucleon particle energy [Run-5
Cu-Cu
web site] |
|||||||
| Summary paper: F. Pilat, L. Ahrens, M. Bai, D.S. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, P. Cameron, R. Connolly, J. DeLong, T. D'Otavio, A. Drees, W. Fischer, G. Ganetis, C. Gardner, J. Glenn, P. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R. Lee, V.N. Litvinenko, Y. Luo, W.W. MacKay, G. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, A. Nicoletti, B. Oerter, V. Ptitsyn, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J. Tuozzolo, K. Vetter, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang, "Operations and performance of RHIC as a Cu-Cu collider", proceedings of the 2005 Particle Accelerator Conference, Knoxville, Tennessee (2005). | |||||||
| Beam
operation: 11/23/04 - 03/07/05 (104 days total, 55 days for physics) |
|||||||
| Run
Coordinator: Fulvia Pilat |
|||||||
| Major accomplishments: 252 m of NEG coated beam pipes installed in warm regions, start-up/ramp-up in 2.5 weeks (1.5 weeks less than planned, excluding 4 weeks repair of bus shorts in Yellow ring), injectors delivered enough bunch intensity to run at beam-beam limit with 4 experiments, β* reduced to 0.9m at STAR | |||||||
| Achieved beam parameters (PHENIX/STAR): | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [nb-1] |
|
| 37/35 |
4.5 |
1.0/0.9 |
15-30 |
2×1028 | 0.8×1028 | 2.4 |
|
| γ
injection: 12.075 |
γ store:
107.502 |
||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β*
[m] |
Luminosity [nb-1] | |||||
| PHENIX | 1.0 |
15.2 |
|||||
| STAR | 0.9 |
15.0 |
|||||
| BRAHMS | 2.5 |
6.2 |
|||||
| PHOBOS | 2.5 |
5.7 |
|||||
| Time in store: 52% of calendar time (run average for physics operation) | |||||||
| Run-4 CY2003/04 FY2004 |
Retreat
after Run-4, 07/07/2004 - 07/08/2004, Port Jefferson [Retreat
web site] |
||||||
| Mode 2: polarized p on
polarized p at 100.0 GeV
particle energy [Run-4 p-p web
site] (development run, not primarily for physics) |
|||||||
| Summary
paper: M. Bai, R. Tomas, L. Ahrens, K. Brown, A. Drees, C.J. Gardner,
J.W. Glenn, W. Fischer, U. Iriso, H. Huang, Y. Luo, F. Pilat, W.W.
MacKay, G. Marr, C. Montag, V. Ptitsyn, R. Roser, T. Satogata, S.
Tepikian, N. Tsoupas, J. van Zeijts, "RHIC
polarized proton new working point commissioning", submitted to
the proceedings of 16th
International Spin Physics Symposium, Trieste, Italy (2004). |
|||||||
| Beam operation: 04/02/2004 - 05/15/2004 (43 days total) | |||||||
| Run
Coordinator: Mei Bai (AGS coordinator: Haixin Huang) |
|||||||
| Major
accomplishments: new AGS warm snake increases AGS polarization by 20%,
maximum polarization
from AGS 50% (consistently 45%), maximum polarization in RHIC at store
45% (consistently 40%), polarized H-jet commissioned and operated for
calibration of RHIC proton-Carbon polarimeters, peak luminosity in
excess of
1031cm-2s-1 at 2 experiments and no
polarization, repeated stores with
40% average polarization and 4·1030cm-2s-1
average luminosity at 4 experiments, new working point (0.69,0.68)
commissioned |
|||||||
| Achieved beam parameters: | |||||||
| no
of bunches |
ions/bunch [109] |
β* [m] |
emittance [μm] |
Lpeak [cm-2s-1] |
Lstore
avg [cm-2s-1] |
Lweek [pb-1] |
|
| 56 |
70 |
1.0 |
20 |
6×1030 | 4×1030 | 0.9 |
|
| Average store polarization: 46% in Blue and
Yellow |
|||||||
| γ injection: 25.936 | γ store: 106.597 | ||||||
| Total delivered integrated luminosities: | |||||||
| Experiment | β*
[m] |
||||||