Rev. Date: October 2000
Pages | LAN Name |
|
|---|---|---|
PROJECT SCOPE (WBS 1) | 1-16 | /SEP 98 |
| Performance Objectives | 2 | 00_scp1c.pdf |
| Collider Rings | 5 | 00_scp2b.pdf |
| The Collider Scenario | 8 | 00_scp3e.pdf |
| Future Improvements | 15 | 00_scp4b.pdf |
LATTICE AND BEAM DYNAMICS (WBS 1.11) | 1-24 | /SEP 95 |
| Arcs | 3 | 01_lat1b.pdf |
| Insertions | 6 | 01_lat2a.pdf |
| Chromatic Effects | 15 | 01_lat3a.pdf |
| YT-jump | 19 | 01_lat4b.pdf |
| Lattice Correction Systems | 23 | 01_lat5b.pdf |
MAGNET SYSTEM (WBS 1.1) | 1-62 | /OCT 96 |
| Overview | 1 | 1_mag01b.pdf |
| Superconductor | 4 | 1_mag02a.pdf |
| Standard Aperture Dipoles | 14 | 1_mag03b.pdf |
| Standard Aperture Quadrupoles | 27 | 1_mag04a.pdf |
| Sextupoles | 37 | 1_mag05a.pdf |
| Corrector Magnets | 41 | 1_mag06b.pdf |
| 13 cm Aperture Insertion Quadrupoles | 48 | 1_mag07b.pdf |
| 10 cm Aperture Insertion Dipole | 55 | 1_mag08a.pdf |
| 18 cm Insertion Dipole | 58 | 1_mag09b.pdf |
| Trim Quadrupole | 61 | 1_mag10a.pdf |
MAGNET ELECTRICAL SYSTEM (WBS 1.2) | 1-27 | /OCT 00 |
| Power Supplies | 1 | 2_me1c.pdf |
| Magnet Bus | 4 | 2_me2b.pdf |
| Cable Tray System | 8 | 2_me3a.pdf |
| Quench Protection System | 10 | 2_me4a.pdf |
| Insertion Power Supply Systems | 12 | 2_me5b.pdf |
| Correction Magnet Power Supply Systems | 21 | 2_me6b.pdf |
| Power Supply Connections of Corrector Magnets | 25 | 2_me7a.pdf |
CRYOGENIC SYSTEM (WBS 1.3) | 1-41 | /JUL 97 |
| Introduction | 1 | 3_cryo1b.pdf |
| Heat Load of Magnets and Refrigeration Distribution System | 4 | 3_cryo2b.pdf |
| Refrigerator Cycle Calculations | 15 | 3_cryo3b.pdf |
| Pressure Ratings | 18 | 3_cryo4b.pdf |
| Pressure Drop of Magnets and Distribution System | 19 | 3_cryo5b.pdf |
| Helium Inventory for RHIC | 24 | 3_cryo6c.pdf |
| System Thermal Mass and Cooldown/Warmup Time Estimates | 26 | 3_cryo7b.pdf |
| System Components | 29 | 3_cryo8c.pdf |
| Cryogenic Control System | 37 | 3_cryo9b.pdf |
VACUUM SYSTEM (WBS 1.4) | 1-10 | /MAR 98 |
| Beam Vacuum | 1 | 4_vac1a.pdf |
| System Configuration | 3 | 4_vac2a.pdf |
| Instrumentation and Control System | 9 | 4_vac3b.pdf |
| Experimental Vacuum Systems | 10 | 4_vac4b.pdf |
BEAM TRANSFER AND INJECTION (WBS 1.5) | 1-22 | /SEP 95 |
| Principal Characteristics and Parameters | 1 | 5_inj1c.pdf |
| Equipment | 3 | 5_inj2b.pdf |
| Operation | 18 | 5_inj3c.pdf |
| Tolerances | 21 | 5_inj4b.pdf |
BEAM DUMP SYSTEM (WBS 1.6) | 1-17 | /AUG 97 |
| System Introduction | 1 | 6_bd1c.pdf |
| Kicker Magnet Requirements and Design | 7 | 6_bd2a.pdf |
| Pulser and PFN Requirements and Design | 10 | 6_bd3a.pdf |
| Beam Absorber | 14 | 6_bd4a.pdf |
| Beam Instrumentation | 17 | 6_bd5a.pdf |
RF SYSTEMS (WBS 1.7) | 1-18 | /JUL 98 |
| General Considerations | 1 | 7_rf1c.pdf |
| The Acceleration rf Cavity and Driver System | 12 | 7_rf2b.pdf |
| The Storage rf Cavity | 13 | 7_rf3b.pdf |
| The Wideband Cavity | 15 | 7_rf4b.pdf |
| Beam Loading Considerations | 16 | 7_rf5b.pdf |
BEAM INSTRUMENTATION (WBS 1.8) | 1-9 | /APR 98 |
| Beam Position and Closed Orbit Measurement | 1 | 8_in1a.pdf |
| Beam Current Monitors | 4 | 8_in2a.pdf |
| Beam Loss Monitor System | 4 | 8_in3a.pdf |
| Transverse Damper/Tune Measurement System | 7 | 8_in4b.pdf |
| Beam Profile Monitor | 9 | 8_in5a.pdf |
| Luminosity Monitor - Zero Degree Calorimeter | 9 | 8_in6a.pdf |
CONTROL SYSTEM (WBS 1.9) | 1-18 | /OCT 93 |
| System Requirements | 1 | 9_cntl1a.pdf |
| System Architecture | 6 | 9_cntl2a.pdf |
| Front-End Systems | 8 | 9_cntl3a.pdf |
| Network and Links | 10 | 9_cntl4a.pdf |
| Control Center | 13 | 9_cntl5a.pdf |
| Software | 14 | 9_cntl6a.pdf |
CONVENTIONAL FACILITIES (WBS 1.10) | 1-9 | /FEB 95 |
| Ring Tunnel and Experimental Halls | 1 | a_cf1b.pdf |
| Shielding | 6 | a_cf2b.pdf |
COLLIDER INSTALLATION (WBS 1.0) | 1-23 | /SEP 98 |
| Ring Element Nomenclature System | 1 | b_inst1a.pdf |
| Tunnel Survey and Magnet Alignment | 7 | b_inst2a.pdf |
| Tunnel Equipment Clear Zone | 15 | b_inst3a.pdf |
| Warm Space Components Allocations | 16 | b_inst4e.pdf |
SAFETY SYSTEMS (WBS 1.12) | 1-4 | /JAN 94 |
| Personnel Safety Systems | 1 | c_sfty1a.pdf |
SYSTEMS INTEGRATION | 1-3 | /AUG 91 |
| Design Requirements Relating to Power Line Perturbation | 1 | d_syst1a.pdf |