LARP Collaboration Meeting 4 Danfords Inn, Port Jefferson, NY, April 6-8, 2005 ![]()
Port Jefferson harbor entrance, east jetty. Left 1872, right 2005.
| Last Name | First Name | Institution | Presentation | ||
| Ambrosio | Giorgio | FNAL | Round table discussion on Long Nb3Sn Magnets | PPT | |
| Ambrosio | Giorgio | FNAL | Supporting R&D plan for FY06 | PPT | |
| Ambrosio | Giorgio | FNAL | Supporting R&D Status of FY05 tasks plan for FY06 | PPT | |
| Andreev | Nikolai | FNAL | Technology development for Nb3Sn long coils & magnets | PPT | |
| Anerella | Mike | BNL | BNL Dipole Magnet Development Plan | PPT | |
| Anerella | Mike | BNL | R&D for Long Wind &React Coils | PPT | |
| Assmann | Ralph | CERN | Cleaning Efficiency of the LHC Collimation System | PPT | |
| Bailey | Roger | CERN | LHC Commissioning Organisation | PPT | |
| Bailey | Roger | CERN | LHC Status & Commissioning Strategy | PPT | |
| Barzi | Emanuela | FNAL | FY06 Strand R&D Tasks and Proposals for LARP | PPT | |
| Barzi | Emanuela | FNAL | FY06 Strand R&D cost & schedule | PPT | |
| Bossert | Rodger | FNAL | TQ2a based studies and Design Optimization | PPT | |
| Bossert | Rodger | FNAL | TQ2a Progress and Plans | PPT | |
| Bossert | Rodger | FNAL | Development of TQ models based on 3-layer Coils | PPT | |
| Cai | YunHai | SLAC | Efficiency of Two-Stage Collimation System | PPT | |
| Cameron | Peter | BNL | TF DAQ | PPT | |
| Cameron | Peter | BNL | Action Items from the TF Workshop and the Design Review | PPT | |
| Caspi | Shlomo | LBNL | TQ1a progress & plans | PPT | |
| Caspi | Shlomo | LBNL | Very large aperture dipoles for a "dipole first" IR | PPT | |
| Caspi | Shlomo | LBNL | Future plans 2006 | PPT | |
| Dietderich | Dan | LBNL | LARP Cable R&D FY05 & FY-06 Plans | PPT | |
| Doyle | Eric | SLAC | LARP Collimation Engineering & Analysis | PPT | |
| Drees | Angelika | BNL | Using RHIC to verify simulated Loss Maps | PPT | |
| Feher | Sandor | FNAL | LARP Magnet test at Fermilab | PPT | |
| Feher | Sandor | FNAL | SQ01b Test and Analysis | PPT | |
| Ferracin | Paolo | LBNL | SQ02 | PPT | |
| Ferracin | Paolo | LBNL | Block-type quadrupoles for a "quad-first" IR | PPT | |
| Ferracin | Paolo | LBNL | Maximum coil stress studies with subscale coils | PPT | |
| Ferracin | Paolo | LBNL | Technology development with subscale quadrupoles | PPT | |
| Ferracin | Paolo | LBNL | Development of TQ models based on 4-layer coils | PPT | |
| Furman | Miguel | LBNL | Electron Cloud | PPT | |
| Ghosh | Arup | BNL | Materials Support | PPT | |
| Gourlay | Steve | LBNL | LARP Magnet Program - Opening Remarks | PPT | |
| Gourlay | Steve | LBNL | LARP Magnet Program - Closing Remarks | PPT | |
| Gupta | Ramesh | BNL | Open Midplane Dipole | PPT | |
| Harms | Elvin | FNAL | Remote Monitoring for Hardware & Beam Commissioning | PPT | |
| Jansson | Andreas | FNAL | Microwave Schottky DAQ | PPT | |
| Jansson | Andreas | FNAL | Proposal for a LARP Schottky task | PPT | |
| Jansson | Andreas | FNAL | Recent Tevatron Schottky Results | PPT | |
| Jones | Rhodri | CERN | CERN Beam Instrumentation DAQ Environment | PPT | |
| Keller | Lewis | SLAC | Energy Deposition Studies in Phase II Collimators | PPT | |
| Lamm | Michael | FNAL | LHC Hardware Commissioning Session | PPT | |
| Lamm | Michael | FNAL | IR Quad Installation and Commissioning + Fitup | PPT | |
| Lamont | Mike | CERN | LHC Commissioning with Beam Overall Strategy | PPT | |
| Lietzke | A. F. | LBNL | LBNL Magnet Test Facility Capabilities | PPT | |
| Mattafirri | Sara | LBNL | CARE Insulation Meeting Report | PPT | |
| Markiewicz | Tom | SLAC | LARP Collimation Program Opening Remarks | PPT | |
| Markiewicz | Tom | SLAC | SLAC Phase II Collimation TaskSchedule & Budget | PPT | |
| Markiewicz | Tom | SLAC | LARP Collimation Program Opening Remarks | PPT | |
| Markiewicz | Tom | SLAC | LARP Collimation Program Closing Remarks | PPT | |
| McIntyre | Peter | TAMU | Optimizing the Intersection Region Performance for LHC | ||
| Mokhov | Nikolai | FNAL | Tertiary Collimators in LHC IP1/IP5 | ||
| Mokhov | Nikolai | FNAL | Energy Deposition in Midplane Dipole | ||
| Muratore | Joseph | BNL | BNL Magnet Test Facility Overview | PPT | |
| Pasquinelli | Ralph | FNAL | Proposal for LHC Microwave Schottky Pickups | PPT | |
| Pasquinelli | Ralph | FNAL | LHC Tune Track/FeedbacK Review | PPT | |
| Peggs | Steve | BNL | Collaboration Meeting Goals | PPT | |
| Peggs | Steve | BNL | Technical, Cost, & Schedule plan for FY06 & 07 | PPT | |
| Peggs | Steve | BNL | Farewell | PPT | |
| Rabehl | Roger | FNAL | IR and D1 Cryogenics and Heat Transfer Studies | PPT | |
| Rasson | Joseph | LBNL | Cryogenic Distribution Boxes and Radiation Absorbers | PPT | |
| Ratti | Alex | LBNL | Beam Instrumentation Summary | ||
| Ratti | Alex | LBNL | LBNL Plans for DAQ | PPT | |
| Ratti | Alex | LBNL | Plans for LHC Instrumentation at LBNL | PPT | |
| Saban | Roberto | CERN | Hardware Commissioning: an update | PPT | |
| Sabbi | Gian Luca | LBNL | Model Magnet R&D | PPT | |
| Sabbi | Gian Luca | LBNL | Long Magnet R&D using Racetracks | PPT | |
| Sabbi | Gian Luca | LBNL | TQ Objectives and Features | PPT | |
| Sabbi | Gian Luca | LBNL | TQ Planning Considerations | PPT | |
| Sabin | Roberto | CERN | LHC Construction and Insatllation | ||
| Schmalzle | Jesse | BNL | Open Midplane Dipole Mechanical Design and Analysis | PPT | |
| Schmickler | Hermann | CERN | CERN perspective | PPT | |
| Schmickler | Hermann | CERN | Calorimeters for LHC luminosity monitoring | PPT | |
| Sen | Tanaji | FNAL | 2nd Generation Magnets for an IR upgrade | PPT | |
| Sen | Tanaji | FNAL | IR and Beam-beam | PPT | |
| Shiltsev | Vladimir | FNAL | LHC Commissioning Task Force | PPT | |
| Simos | Nick | BNL | Material Irradiation Studies for LHC Collimators | ||
| Simos | Nick | BNL | Radiation tests of LHC collimator materials for Phase 1&2 | DOC | |
| Syphers | Mike | FNAL | Accelerator Physics and Commissioning | ||
| Toohig | Timothy | FNAL | Toohig Fellowships in Accelerator Science at the LHC | PPT | |
| Vay | Jean-Luc | LBNL | 3-D self-consistent simulations of e-cloud physics | PPT | |
| Wanderer | Peter | BNL | Recommendations of December Review of Open Midplane Dipole Program | PPT | |
| Zlobin | A.V. | FNAL | Design Studies: FY05 work status and FY06 goals | PPT | |
| Zlobin | A. V. | FNAL | Design studies of IRQ based on shell-type coils | PPT |
SCHEDULE
GOALS:
1. Present technical and resource loaded plans for existing Tasks for FY06 and FY07.
2. Present proposed new Tasks.
3. Look forward: no survey retrospectives!
DIPLOMATIC ROOM BOARDROOM #2 BOARDROOM #3 BOARDROOM #4 Plenaries & magnet sessions Accelerator Physics & Commissioning Instrumentation & pre-meets Collimation Tue Apr 5 -- -- Magnet pre-meeting, L2s -- Wed Apr 6 Opening Plenary (Ferbel) -- -- -- L2 Coordinators (Gourlay) LHC Status, Comm. Task Force (Syphers) Tune Feedback, Schottky FY05 plans & progress 1800: Cash Bar Reception, Danfords Ballroom Thu Apr 7 Design Studs, Supporting R&D Hardware & IR Commissioning (Lamm) Schottky cont. (Ratti) A plan for FY06 Model Magnets, Materials Acceleratior Physics (Fischer) Controls interfaces (Ratti) FY06 budget request Fri Apr 8 Closing Plenary (Peggs)