LARP Collaboration Meeting 4 Danfords Inn, Port Jefferson, NY, April 6-8, 2005   Port Jefferson harbor entrance, east jetty. Left 1872, right 2005.
PARTICIPANTS
Click to view full picture
68 people registered by March 25 2005.


PRESENTATIONS
(in alphabetical order by last name)

Last NameFirst NameInstitution Presentation
Ambrosio Giorgio FNAL Round table discussion on Long Nb3Sn Magnets   PPT   PDF
Ambrosio Giorgio FNAL Supporting R&D plan for FY06   PPT   PDF
Ambrosio Giorgio FNAL Supporting R&D Status of FY05 tasks plan for FY06   PPT   PDF
Andreev Nikolai FNAL Technology development for Nb3Sn long coils & magnets   PPT   PDF
Anerella Mike BNL BNL Dipole Magnet Development Plan   PPT   PDF
Anerella Mike BNL R&D for Long Wind &React Coils   PPT   PDF
Assmann Ralph CERN Cleaning Efficiency of the LHC Collimation System   PPT   PDF
Bailey Roger CERN LHC Commissioning Organisation   PPT   PDF
Bailey Roger CERN LHC Status & Commissioning Strategy   PPT   PDF
Barzi Emanuela FNAL FY06 Strand R&D Tasks and Proposals for LARP   PPT   PDF
Barzi Emanuela FNAL FY06 Strand R&D cost & schedule   PPT   PDF
Bossert Rodger FNAL TQ2a based studies and Design Optimization   PPT   PDF
Bossert Rodger FNAL TQ2a Progress and Plans   PPT   PDF
Bossert Rodger FNAL Development of TQ models based on 3-layer Coils   PPT   PDF
Cai YunHai SLAC Efficiency of Two-Stage Collimation System   PPT   PDF
Cameron Peter BNL TF DAQ   PPT   PDF
Cameron Peter BNL Action Items from the TF Workshop and the Design Review   PPT   PDF
Caspi Shlomo LBNL TQ1a progress & plans   PPT   PDF
Caspi Shlomo LBNL Very large aperture dipoles for a "dipole first" IR   PPT   PDF
Caspi Shlomo LBNL Future plans 2006   PPT   PDF
Dietderich Dan LBNL LARP Cable R&D FY05 & FY-06 Plans   PPT   PDF
Doyle Eric SLAC LARP Collimation Engineering & Analysis   PPT   PDF
Drees Angelika BNL Using RHIC to verify simulated Loss Maps   PPT   PDF
Feher Sandor FNAL LARP Magnet test at Fermilab   PPT   PDF
Feher Sandor FNAL SQ01b Test and Analysis   PPT   PDF
Ferracin Paolo LBNL SQ02   PPT   PDF
Ferracin Paolo LBNL Block-type quadrupoles for a "quad-first" IR   PPT   PDF
Ferracin Paolo LBNL Maximum coil stress studies with subscale coils   PPT   PDF
Ferracin Paolo LBNL Technology development with subscale quadrupoles   PPT   PDF
Ferracin Paolo LBNL Development of TQ models based on 4-layer coils   PPT   PDF
Furman Miguel LBNL Electron Cloud   PPT   PDF
Ghosh Arup BNL Materials Support   PPT   PDF
Gourlay Steve LBNL LARP Magnet Program - Opening Remarks  PPT   PDF
Gourlay Steve LBNL LARP Magnet Program - Closing Remarks   PPT   PDF
Gupta Ramesh BNL Open Midplane Dipole   PPT   PDF
Harms Elvin FNAL Remote Monitoring for Hardware & Beam Commissioning   PPT   PDF
Jansson Andreas FNAL Microwave Schottky DAQ   PPT   PDF
Jansson Andreas FNAL Proposal for a LARP Schottky task   PPT   PDF
Jansson Andreas FNAL Recent Tevatron Schottky Results   PPT   PDF
Jones Rhodri CERN CERN Beam Instrumentation DAQ Environment   PPT   PDF
Keller Lewis SLAC Energy Deposition Studies in Phase II Collimators   PPT   PDF
Lamm Michael FNAL LHC Hardware Commissioning Session   PPT   PDF
Lamm Michael FNAL IR Quad Installation and Commissioning + Fitup   PPT   PDF
Lamont Mike CERN LHC Commissioning with Beam Overall Strategy   PPT   PDF
Lietzke A. F. LBNL LBNL Magnet Test Facility Capabilities   PPT   PDF
Mattafirri Sara LBNL CARE Insulation Meeting Report   PPT   PDF
Markiewicz Tom SLAC LARP Collimation Program Opening Remarks   PPT   PDF
Markiewicz Tom SLAC SLAC Phase II Collimation TaskSchedule & Budget   PPT   PDF
Markiewicz Tom SLAC LARP Collimation Program Opening Remarks   PPT   PDF
Markiewicz Tom SLAC LARP Collimation Program Closing Remarks   PPT   PDF
McIntyre Peter TAMU Optimizing the Intersection Region Performance for LHC      PDF
Mokhov Nikolai FNAL Tertiary Collimators in LHC IP1/IP5      PDF
Mokhov Nikolai FNAL Energy Deposition in Midplane Dipole      PDF
Muratore Joseph BNL BNL Magnet Test Facility Overview   PPT   PDF
Pasquinelli Ralph FNAL Proposal for LHC Microwave Schottky Pickups   PPT   PDF
Pasquinelli Ralph FNAL LHC Tune Track/FeedbacK Review   PPT   PDF
Peggs Steve BNL Collaboration Meeting Goals   PPT   PDF
Peggs Steve BNL Technical, Cost, & Schedule plan for FY06 & 07   PPT   PDF
Peggs Steve BNL Farewell   PPT   PDF
Rabehl Roger FNAL IR and D1 Cryogenics and Heat Transfer Studies   PPT   PDF
Rasson Joseph LBNL Cryogenic Distribution Boxes and Radiation Absorbers   PPT   PDF
Ratti Alex LBNL Beam Instrumentation Summary      PDF
Ratti Alex LBNL LBNL Plans for DAQ   PPT   PDF
Ratti Alex LBNL Plans for LHC Instrumentation at LBNL   PPT   PDF
Saban Roberto CERN Hardware Commissioning: an update   PPT   PDF
Sabbi Gian Luca LBNL Model Magnet R&D   PPT   PDF
Sabbi Gian Luca LBNL Long Magnet R&D using Racetracks   PPT   PDF
Sabbi Gian Luca LBNL TQ Objectives and Features   PPT   PDF
Sabbi Gian Luca LBNL TQ Planning Considerations   PPT   PDF
Sabin Roberto CERN LHC Construction and Insatllation      PDF
Schmalzle Jesse BNL Open Midplane Dipole Mechanical Design and Analysis   PPT   PDF
Schmickler Hermann CERN CERN perspective   PPT   PDF
Schmickler Hermann CERN Calorimeters for LHC luminosity monitoring   PPT   PDF
Sen Tanaji FNAL 2nd Generation Magnets for an IR upgrade   PPT   PDF
Sen Tanaji FNAL IR and Beam-beam   PPT   PDF
Shiltsev Vladimir FNAL LHC Commissioning Task Force   PPT   PDF
Simos Nick BNL Material Irradiation Studies for LHC Collimators      PDF
Simos Nick BNL Radiation tests of LHC collimator materials for Phase 1&2   DOC   PDF
Syphers Mike FNAL Accelerator Physics and Commissioning      PDF
Toohig Timothy FNAL Toohig Fellowships in Accelerator Science at the LHC   PPT   PDF
Vay Jean-Luc LBNL 3-D self-consistent simulations of e-cloud physics   PPT   PDF
Wanderer Peter BNL Recommendations of December Review of Open Midplane Dipole Program   PPT   PDF
Zlobin A.V. FNAL Design Studies: FY05 work status and FY06 goals   PPT   PDF
Zlobin A. V. FNAL Design studies of IRQ based on shell-type coils   PPT   PDF

SCHEDULE

GOALS:
1. Present technical and resource loaded plans for existing Tasks for FY06 and FY07.
2. Present proposed new Tasks.
3. Look forward: no survey retrospectives!


DIPLOMATIC ROOM               BOARDROOM #2                            BOARDROOM #3                  BOARDROOM #4                 
Plenaries & magnet sessions   Accelerator Physics & Commissioning     Instrumentation & pre-meets   Collimation

Tue Apr 5
--                            --                                      Magnet pre-meeting, L2s       --

Wed Apr 6
Opening Plenary (Ferbel)      --                                      --                            --
L2 Coordinators (Gourlay)     LHC Status, Comm. Task Force (Syphers)  Tune Feedback, Schottky       FY05 plans & progress
1800: Cash Bar Reception, Danfords Ballroom

Thu Apr 7
Design Studs, Supporting R&D  Hardware & IR Commissioning (Lamm)      Schottky cont. (Ratti)        A plan for FY06
Model Magnets, Materials      Acceleratior Physics (Fischer)          Controls interfaces (Ratti)   FY06 budget request

Fri Apr 8
Closing Plenary (Peggs)


DANFORDS RESERVATIONS

The meeting is being held at Danfords on the Sound (Conference Center, Inn, and Marina), where a block of rooms has been reserved. Please make reservations directly, by phoning +1-631-928-5200 before Friday March 4. Mention Brookhaven National Laboratory in order to get the reduced rate of $126 per day (single or double room).

Visitor Information


Maintained by Ila Campbell   Angelika Drees