First LARP Collaboration Meeting
Port Jefferson, NY, Sept 16-18, 2003


LARGE CONFERENCE PHOTO


PRESENTATIONS

Last NameFirst NameInstitutionPresentation
AnerellaMikeBNL BNL Dipole R&D  PPT  PDF
ByrdJohnLBNL LARP Instrumentation Commissioning Strategy  PPT  PDF
Lumi Test at the FNAL Radiation Damage Facility  PPT  PDF
Measuring Betatron Tunes with Synchrotron Light  PPT  PDF
(Closing Plenary) Instrumentation Plan for FY04  PPT  PDF
CameronPeteBNL Tune & Chromaticity Measurement & Feedback  PPT  PDF
CaspiShlomoLBNL Experiments and Analysis  PPT  PDF
ChiuMickeyColumbia RHIC Zero Degree Calorimeter  PPT  PDF
ConnollyRogerBNL RHIC Ionization Profile Monitors  PPT  PDF
De SantisStefanoLBNL Development of a Longitudinal Density Monitor  PPT  PDF
DietdereichDanLBNL Conductor and Cable R&D    PDF   
Quadrupole R&D, Conductor & Cable R&D  PPT  PDF
FischerWolframBNL Commissioning Strategy  PPT  PDF
Coherent Beam-Beam Effects  PPT  PDF
FurmanMiguelLBNL Proposal for Electron Cloud Activities (FY04)  PPT  PDF
GourlaySteveLBNL Superconducting Magnet R&D Program  PPT  PDF
(Closing Plenary) SC Magnet R&D Program  PPT  PDF
GuptaRameshBNL BNL LARP Dipole R&D  PPT  PDF
IrisoUbaldoBNL Electron Cloud at RHIC  PPT  PDF
KashikinVadimFNAL Quad R&D Issues and Options  PPT  PDF
FNAL LARP Dipole R&D  PPT  PDF
LammMikeFNAL FNAL Participation in Hardware Commissioning  PPT  PDF
(Closing Plenary) Hardware Comm. Summary  PPT  PDF
LitvinenkoVladimirBNL Novel Beam-Profile Light Monitors  PPT  PDF
MarkiewiczTomSLAC LHC Collimator R&D    PDF
MarrinerJohnFNAL FNAL Work on Instrumentation for LHC  PPT  PDF
MurrayMichaelUK Zero Degree Calorimetry for LHC  PPT  PDF
OstojicRankoCERN LHC Status, Interfaces, Upgrade  PPT  PDF
Hardware Commissioning: CERN Perspective  PPT  PDF
Optics Status & Challenges  PPT  PDF
PeggsSteveBNL Accelerator Systems Overview  PPT  PDF
Remote Operations & Maintenance  PPT  PDF
(Closing Plenary) Acc. Phys. and Beam Comm.  PPT  PDF
PilatFulviaBNL IR Optics Compensation  PPT  PDF
Hadron Collider Commissioning Workshop  PPT  PDF
QiangJiLBNL State of the Art Beam-Beam Simulations  PPT  PDF
RassonJosephLBNL DFBX Shipping Schedule  PPT  PDF
RattiAlexLBNL Lumi Detector Fabrication and Testing  PPT  PDF
SabbiGianlucaLBNL Quadrupole R&D Phase 1    PDF  
LBNL LARP Dipole R&D    PDF  
SchmicklerHermannCERN e-cloud Contributions Suggested to LBNL    PDF
Initial Beam Instrumentation  PPT  PDF
SenTanajiFNAL AP Issues in the IR Upgrade  PPT  PDF
Beam-Beam Compensation at the Tevatron  PPT  PDF
StraitJimFNAL Objectives of the Collaboration Meeting  PPT  PDF
IR Upgrade Overview    PDF
(Closing Plenary) "The Last Word"  PPT  PDF
VetterKurtBNL Schottky Diagnostics    PDF
WandererPeterBNL Commissioning of BNL Hardware  PPT  PDF
WhiteSebastianBNL The ZDC Connection    PDF
ZlobinSashaFNAL Quadrupole Model Magnet R&D   PPT  PDF
 

AGENDA

LARP Collaboration Meeting Agenda, TUESDAY Sept 16, 2003
Sept 18, 2003
NOTES:
1) GOAL: develop a detailed LARP plan for FY04, consistent with long term strategy and short term constraints
2) Presentations are intended to enable informal discussions, rather than to be works of art
3) The agenda can (and will) be modified - comments are solicited
BAYLES room WILLSE room BOARDROOM 4
Tuesday 9/16/2003
Opening Plenary (P. Bryant) Available
9:00 Welcome & organizational details S. Peggs
9:05 Collaboration meeting objectives J. Strait
9:20 LHC schedule, interface, & upgrade R. Ostojic
9:50 Accelerator systems overview S. Peggs
10:20 Discussion
10:30 BREAK
Available
11:00 IR upgrade overview J. Strait
11:20 IR upgrade AP issues T. Sen
11:50 Magnet parameters and R&D overview S. Gourlay
12:20 Discussion
12:30 LUNCH 12:30 LUNCH
Hardware Commissioning (M. Lamm) Beam Commissioning (M. Furman) Available
13:30 Hardware overview R. Ostojic 13:30 Commissioning strategy W. Fischer
13:40 FNAL hardware commissioning M. Lamm 13:50 Instrumentation strategy J. Byrd
13:55 LBNL hardware commissioning J. Rasson 14:10 Remote operations & maintenance S. Peggs
14:10 BNL hardware commissioning P. Wanderer 14:30 Potential AP collaboration issues for '04 H. Schmickler
14:25 Plans for FY04 and beyond M. Lamm 14:50 Hadron collider commissioning workshop? F. Pilat
15:00 Discussion 15:00 Discussion
15:30 BREAK 15:30 BREAK
Quadrupole R&D (A. Zlobin) Initial Instrumentation - 1 (A. Drees) Available
16:00 Quad R&D Issues and Options V. Kashikin 16:00 Summary of Jan 03 instrumentation mtg H. Schmickler
16:20 Quad R&D Phase 1 G. Sabbi 16:15 Introduction and scope J. Byrd
16:40 Quad Technology Development S. Caspi 16:20 Lumimonitor hardware status A. Ratti
17:00 Conductor and Cable R&D D. Dietdereich 16:45 Test beam at Fermilab J. Byrd
17:20 Discussion 17:00 Discussion
18:30 ADJOURN 18:30 ADJOURN

LARP Collaboration Meeting Agenda, WEDNESDAY Sept 17, 2003
BAYLES room WILLSE room BOARDROOM 4
Wednesday 9/17/2003
Dipole R&D (M. Harrison) Initial Instrumentation - 2 (A. Drees) Beam-Beam interaction (F. Pilat)
8:30 BNL LARP Dipole R&D R. Gupta 9:00 Longitudinal Density Monitor S. de Santis 9:00 State of the art simulations J. Qiang
8:50 FNAL LARP Dipole R&D V. Kashikhin 9:30 Tune & chrom msmt & feedback (1) P. Cameron 9:20 Beam-beam compensation systems T. Sen
9:10 LBNL LARP Dipole R&D G. Sabbi 10:00 Tune & chrom msmt & feedback (2) J. Marriner 9:40 Coherent effects W. Fischer
9:30 Conductor and Cable R&D A. Ghosh 10:15 Tune msmt using synchrotron radiation J. Byrd 10:00 Discussion
10:00 Discussion
10:30 BREAK 10:30 BREAK 10:30 BREAK
FY04, 05 Priorities and Plans - 1 (S. Gourlay) Discussion (INITIAL Instr. plan) (Byrd/Drees) Beam background (T. Sen)
11:00 Experiments and Analysis S. Caspi 11:00 Electron cloud simulations M. Furman
11:30 Conductor and Cable R&D Plan D. Dietdereich 11:30 Electron clouds at RHIC U. Iriso
12:00 IR Quad R&D A. Zlobin 12:00 Consumable collimators T. Markiewicz
12:30 LUNCH 12:30 LUNCH 12:30 LUNCH
FY04, 05 Priorities and Plans - 2 (S. Gourlay) Additional Instrumentation (J. Byrd) IR Upgrade Acc Phys (T. Sen)
13:30 Dipole R&D M.Anerella 13:30 High frequency Schottky K. Vetter 13:30 Optics status & challenges R. Ostojic
14:00 Discussion 13:50 Ionization Profile Monitors R. Connolly 14:00 IR optics compensation F. Pilat
14:05 RHIC experience with ZDCs M. Chiu 14:30 Discussion
14:20 ZDCs for LHC heavy ions M. Murray
14:35 Novel synch light monitors V. Litvinenko
15:30 BREAK 15:30 BREAK 15:30 BREAK
16:00 Generate FY04/05 plan (Gourlay) 16:00 Discussion (ADDITIONAL Instr. plan) (Byrd/Drees) 16:00 Generate FY04/05 plan (Furman/Pilat/Sen)
18:30 ADJOURN 18:30 ADJOURN 18:30 ADJOURN

LARP Collaboration Meeting Agenda, THURSDAY, Sept 18, 2003
BAYLES room
Thursday 9/18/2003
Closing Plenary (H. Schmickler)
9:00 Magnets S. Gourlay
9:45 Accelerator Physics & Beam Commissioning S. Peggs
10:30 BREAK
11:00 Instrumentation J. Byrd
11:30 Hardware commissioning M. Lamm
11:45 The last word J. Strait
12:30 ADJOURN / LUNCH


PARTICIPANTS

anerella mike BNL mda@bnl.gov
barletta bill LBNL wabarletta@lbl.gov
bryant phil CERN philip.bryant@cern.ch
byrd john LBNL jmbyrd@lbl.gov
cameron pete BNL cameron@bnl.gov
caspi shlomo LBNL s_caspi@lbl.gov
chiu mickey Columbia chiu@nevis.columbia.edu
connolly roger BNL connolly@bnl.gov
de santis stefano LBNL sdesantis@lbl.gov
dietdereich dan LBNL drdietderich@lbl.gov
drees angelika BNL drees@bnl.gov
fischer wolfram BNL wolfram.fischer@bnl.gov
furman miguel LBNL mafurman@lbl.gov
ghosh arup BNL ghosh@bnl.gov
gourlay steve LBNL sagourlay@lbl.gov
gupta ramesh BNL gupta@bnl.gov
harrison mike BNL harrison@bnl.gov
iriso ubaldo BNL ubaldo@bnl.gov
kashikin vadim FNAL vadim@fnal.gov
lamm mike FNAL lamm@fnal.gov
litvinenko vladimir BNL vl@bnl.gov
markiewicz tom SLAC twmark@slac.stanford.edu
marriner john FNAL marriner@fnal.gov
murray michael UK murray@ku.edu
ostojic ranko CERN ranko.ostojic@cern.ch
peggs steve BNL peggs@bnl.gov
pilat fulvia BNL pilat@bnl.gov
qiang ji LBNL qiang@lbl.gov
rasson joseph LBNL jerasson@lbl.gov
ratti alex LBNL aratti@lbl.gov
sabbi gianluca LBNL glsabbi@lbl.gov
schmickler hermann CERN hermann.schmickler@cern.ch
sen tanaji FNAL tsen@fnal.gov
strait jim FNAL strait@fnal.gov
tomas rogelio BNL rtomas@bnl.gov
vetter kurt BNL vetter@bnl.gov
wanderer peter BNL wanderer@bnl.gov
willen erich BNL willen@bnl.gov
zlobin sasha FNAL zlobin@fnal.gov

Maintained by Ila Campbell   Steve Peggs