The Relativistic Heavy Ion Collider Run-9
 
100 GeV Polarized Protons Operation
[STAR]   [PHENIX]   [Machine/Detector Planning]  
[RHIC AGS Machine Status] [ Scheduling Physicist] [Accelerator Physics Experiments]


max. achieved this run:

E
GeV
100
Lpeak
1031 cm-2s-1

Lavg
pb-1/week
[as of 04/13/2009]

[C-AD Broadcast]  [Ring Temperatures]  [Configuration Control]

[RHIC pp Elog]  [OC Elog]  [Elogs]  [RHIC Shift Leaders Schedule
[pp Run9 History]  [Plan of the Day]  [CNI Polarimeter Instructions]  [RHIC pp Setup Plan]  
[AGS pp Elog]  [AGS shift leaders Schedule]  [AGS Run Schedule]  [AGS Recipe]





[RHIC Runs overview]  [Controls]  [Operations]  [QLI Analysis]

RHIC Run Coordinator:

Christoph Montag

montag@bnl.gov

347-432-2605 (cell)

631-344-4820 (office)

Deputy:

Mei Bai

mbai@bnl.gov

631-521-1846 (home)

631-344-3397 (office)