RHIC Polarized Proton FY05 Run Schedule

Content

*      Goal for 205 GeV development

*      Setup & configuration

*      development Plan

*      shift schedule

Goal for 205GeV development

*      establish ramp to 205 GeV to explore

1.      the polarization behavior beyond 100 GeV

2.      the contribution of orbit distortion to the amount of polarization loss at snake resonances. This shall provide us a guidance for the re-alignment during the summer shutdown

 

*      provide collisions at Ös = 410 GeV for experiments

 

Back to top

Setup & Configuration

*      Lattice (IP 6 8 10 12 2 4)

v     Injection: 10 10 10 10 10 10

v     Store:        2   2 10   5   3 10

*      Beam energy

v     Injection: Gg=46.5

v     Store: Gg=391.5

*      Working point:

v     Qx=28.73, Qy=29.72: ramp from injection to 100GeV

v     Qx=28.69, Qy=29.68: from 100 GeV to flattop and store

*      Golden orbit

v      Zero orbit

*      snakes & spin rotators

v     snakes: on at DC from injection to flattop

v     spin rotator: off

*      experiment magnets:

v     STAR: On at full field from injection to flattop

v     Phenix: On at full field from injection to flattop

*      RF setup:

v     No re-bucketing

 

Back to top

Shift Schedule

*      May 31 0800May 31 2400

o       8 bunch ramp development

o       Adjust orbits/tunes/chromaticities along the ramp to maximize transmission efficiency

o       Tunes: Qx=0.69, Qy=0.68

o       Orbits: rms ~ 0.5mm or better

o       Separation bump through the ramp

*      May 31 2400June 1 1600

o       Global decoupling along the ramp

o       Local IR non-linear correction

*      June 1 1600June 2 0800

o       56 bunch ramp development

o       Fine adjustment of tunes/chromaticities

o       Polarization measurement along the ramp

o       Collision setup

o       Cog beam into collision, fine adjust orbits/optics to minimize the beam decay

*      June 2 0800June 2 1600

o       Store setup: IP6, IP8, IP10

o       Steering setup

o       Collimation setup

*      June 2 1600 – June 3 0800: store at 205 GeV

o       Parasitically study the dependence of the resonance strength at 135GeV on the orbit distortion

 

Shift Schedule

*      May 31 0800May 31 1600: Mei

*      May 31 1600May 31 2400: Vadim

*      May 31 2400June 1 0800: Yun

*      June 1 0800June 1 1600: Fulvia

*      June 1 1600June 1 2400: Jorg

*      June 1 2400June 2 0800: Todd

*      June 2 0800June 2 1600: Angelika

 

Web address

mbai@bnl.gov

Office phone

(631)344-3397

 

Back to top

 

Last revised: May. 24, 2005