AGS PP Status
Preparation for RHIC pp
Feb. 25
1. Warm snake has been installed
2. CNI polarimeter will need another access(Feb. 26) behind the RHIC store
3. 200MeV polarimeter measured polarization of 70%.
4. AGS pp run starts Feb. 26
Schedule
o March 24 switching over from Au run
Snakes and Rotators
o Don Bruno found some problems with the QPA of the snake which was broke during the previous pp run
o The testing on all the snake and rotator quench protection system is expected to be started early March.
Jet target
o On schedule
CNI polarimeter
(631)344-3397