*      AGS PP Status

*      Preparation for RHIC pp

AGS PP Status

*      Feb. 25

1.      Warm snake has been installed

2.      CNI polarimeter will need another access(Feb. 26) behind the RHIC store

3.      200MeV polarimeter measured polarization of 70%.

4.      AGS pp run starts Feb. 26

 

Back to top

Preparation for RHIC

*      Schedule

o       March 24 switching over from Au run

*      Snakes and Rotators

o       Don Bruno found some problems with the QPA of the snake which was broke during the previous pp run

o       The testing on all the snake and rotator quench protection system is expected to be started early March.

*      Jet target

o       On schedule

*      CNI polarimeter

 