Haixin Huang
Environment: The setup of the AGS for polarized running takes place behind RHIC stores, with Au in the two RHIC rings. RHIC activities required for the present run generally take priority but should not affect our setup.
General
Objectives:
a) Establish an injector setup providing protons with polarization above 50% (or “as high as possible”) and >10^11/bunch at a Gγ = 46.5 energy.
b) Understand the sensitivity of this setup to the usual parameters – emittance, tunes(t), chromaticity(t), snake strength(t), beam intensity, etc.
c) Commission the new Helical warm snake. Expect work on orbit corrections at injection and along the ramp.
d) Commission the new upgraded AGS CNI polarimeter. To make real progress in understanding polarization losses in AGS, the new CNI polarimeter is essential. Therefore commissioning this polarimeter will be a major piece of the plan.
The time estimated at end of each task should time a factor two for scenario running behind RHIC. So the plan is to deliver 50% polarization to RHIC in about three weeks.
Plans
Pre-snake stage: The likely scenario would be that helical snake not ready on day one of AGS pp operation. We would like to use this time to work on general AGS main magnet function setup, Booster harmonic correction (with e880 polarimeter).
Snake ready stage:
Expect to reach 50% polarization (with 75% as input) and 10^11 intensity (this has never been done before). If this goal is reached, then the remaining time will be divided into two parts: maintaining polarized beam for RHIC injection, and AGS study. For the AGS study part, following is the list of agenda: