The Relativistic Heavy Ion Collidor Run-4
 
Polarized Proton Operation


[Star]   [Phenix]   [Phobos]   [Brahms]   [RHICSpin]
[RHIC AGS Machine Status] [Scheduling Physicist] [Beam Experiments]



Avg_Lum
[L:cm-2s-1]
Polarization
[P]
Fig. of Merit
[L*(P1*P2)**2]
4e30
B: 0.45, Y: 0.40
1e29
Weekly Luminosity
Total Luminosity


[C-AD Broadcast] [Ring Temperatures]    [Retreat 2004]
[Elogs]   [OC Elog]  
[RHIC PP Elog]  [RHIC Shift Leaders Schedule]  [RHIC Run Schedule]
[AGS PP Elog]   [ AGS Shift Leaders Schedule] [AGS Run Schedule] [AGS Recipe]
RHIC Parameters:

energy[Ggamma]
working point(Qx,Qy) for the ramp
lattice(IP 6 8 10 12 2 4)
injection
46.5 B:28.73,29.72, Y:28.72,29.73
10 10 10 10 10 10
ramp
46.5 -- 191.5
B:28.73,29.72, Y:28.72,29.73
beta squeeze
store
191.5
B:28.69, 29.68, Y:28.68,29.69
1 1 3 10 3 10
Run Summary: April 2 0800 -- May 15 0800

[RHIC_PP Run History]  [AGS Run Progress]
[Booster/AGS/RHIC Parameters]   [Operations]   [RHIC Operations]
[Controls]   [QLI Analysis
BNL Phone Book Search:
[BNL Homepage]
RHIC Run Coordinator: Mei Bai
mbai@bnl.gov 631-721-6249 (cell) 631-344-3397 (office) 631-696-1266 (home)
Deputy: Wolfram Fischer
wfischer@bnl.gov 631-807-5476 (cell) 631-344-5452 (office) 631-821-2698 (home)
AGS Run Coordinator:
Haixin Huang
huanghai@bnl.gov

631-344-5446 (office)

Last modified: Wed Mar 10 9:00:00 EST 2004