| System | commissioner |
comments |
status |
changes |
| Elog |
Todd,
Ila, Angelika |
available?
(yes) any new
features? (yes) |
done |
N |
| AtR |
Nick
T., Woody ... |
setpoints
for Au, AtR
managers, AtR orbit, BPMs, loss monitors, emittance measurements
(automatic measurements, records?) |
partly
done |
Y |
| -> |
new AtR manager was not ready for testing, testing
was done with old manager, lattice matched to existing Au8 lattice - automation of emittance measurements from AGS & AtR still going on |
|||
| RHIC
operations GPMs,
StartUp |
operations,
Angelika, Greg |
ramp,
magnets, beam
current, fill pattern, SpecMan, etc. |
done |
N |
| Logger |
Roger
L. |
test |
done |
N |
| LogView |
Ted |
test |
done |
Y |
| Permit
Link |
Rob,
operations |
check
out |
done |
N |
| Abort
kickers |
Leif,
Arlene |
check
out |
done |
N |
| -> |
tested with ramping, abort kickers tested, working
properly |
|||
| Plotfill,
FDAview |
Todd |
test |
done |
Y |
| BLAM |
Jonathan,
Greg, Leif |
test |
done |
N |
| RHIC
Injection |
Wolfram,
Arlene |
event
generation and
detection, software changes?, check out |
partly
done |
N |
| -> |
new version with Au parameters released, no further
testing was done Injection kickers tested, working properly, need to follow up with Wolfram |
|||
| Sequencer |
Ted,
Jen, Todd, Molly,
Nick K., ... |
new
C++ version, test (see comments below, Day 3) |
done |
Y |
| tape |
Jen |
combined
test w. sequencer, mode switching for dAu |
done |
Y |
| Configuration
Control |
Greg,
Angelika |
check
status |
not
done |
Y |
| -> |
use desired tunes in applications (BBQ, ARTUS, tune
display ....) |
|||
Day 2 (instrumentation)
| System |
commissioner |
comments |
status |
changes |
| IPM |
Roger
C, Steve T |
test
application |
done |
N |
| WCM |
Roger
L |
test,
new scopes, ethernet |
done |
Y |
| WCM in general tested: working properly, new scopes
are working - some modification in labview code still to be done - connection with tape-sequencer to get timing for transition-mode - action item: new calibration factors need to be set (with beam!) |
||||
| RHIC
vacuum, pressure
display |
Dick
H, Haixin, Seth |
test
(application) |
not
done |
N |
| e-
detectors |
SY,
Angelika, ...? |
check
out, test |
not
done |
N |
| AC
dipole |
Mei |
work
test |
done |
N |
| transition
monitor
(button pickup) |
Mike
Blasko, Angelika,
Roger L |
test
application |
n.a. |
Y |
| -> |
scope installed, connected to eathernet, data
up-load time: approx. 2.5 min. action items: - locate hybrids, install - finish cabling, matching, trigger cables - OR box for blue/yellow triggers - ADO design (pet page), for day 1: labview - run analysis code on scope (likely with beam) |
|||
| BPMs |
Rob,
Todd |
managers,
timing |
partly
done |
Y |
| -> |
old managers only |
|||
| Tune
Meter (Artus) |
Rob,
Angelika, Jonathan |
test
new software |
done |
Y |
| Injection
Damper |
Rob,
Angelika |
check
out |
done |
N |
| BBQ,
feedback, transition
monitor, BTF |
Pete
C, Al, Carl, ... |
test,
check out |
Pete |
Y |
| -> |
done: - BBQ functional, disable other devices tested - chromaticity algorithm tested - sign swap in chromaticity measurements fixed - lock bit: implemented and operational (?) - BTF application checked and operational to do: - Brho correction during the ramp - feed forward application - desired tune/chrom appl. : what is this? - BTF appl.: calculate and show tune distribution - lock bit: verify interface to sequencer - feedback on the ramp operational? - injection stabilization? |
|||
| Schottky |
Kevin,
...? |
test |
partly done |
N |
| -> |
small software changes still ongoing, no updates
seen in DQmin |
|||
| RF,
applications |
Tom
H |
check
out |
done |
N |
| collimators |
Angelika,
Wenge |
test,
start from sequencer |
partly done |
Y |
| -> |
action items: - fix skew plane ADO home function (in progress) - fix one motion driver (in progress) - dedicated GPM for backgrounds (done) - one limit switch flaky - start from tape-sequencer (done) |
|||
| gap
cleaner |
Angelika,
Wenge |
test,
start from sequencer |
partly done |
Y |
| -> |
10 Hz duty cycle tested, operational action item: some small software changes in application to be done start from tape-sequencer (done) |
|||
| Tune
Display |
Dan |
test |
done |
N |
| Loss
Monitors & Thresholds |
Mei,
Seth |
RHIC,
AtR, injection data |
done |
N |
| Jump
Watch |
Christoph |
test |
partly done |
N |
| 10
Hz Feedback |
Christoph,... |
status?,
check out |
done |
Y |
| polarimeter |
Haixin,
Seth, ... |
test
polarimeter hardware
and software in case of pp |
not
done |
Y |
| -> |
significant changes in server software, tested in
AGS but not RHIC, hardware modifications (target holder) were still
going on |
|||
| System |
Commissioner |
comment |
status |
changes |
| Ramping
systems & online model |
Al,
Steve, Nikolay, Todd |
WFG
manager, online model
... OrbitCalc, opticalc, online-offline interface ... |
partly done |
Y |
| -> |
orbitcalc:
new library (version V2) feature: calculate tune shift from sextupoles after correction opticalc: new version V2 implemented: b* matching, offline model interface (SXF) to be done: new sextupole scheme |
|||
| OrbitDisplay |
Vadim |
test
(both versions) |
done |
Y |
| LISA |
Ted,
Angelika |
test
new features |
partly
done |
Y |
| -> |
done: save
configuration, stop update action items: cross section calculation (in progress) |
|||
| Orbit
Correction |
Nikolay,
Vadim |
test
new version (see
above) |
done |
Y |
| Skew Mod | Yun |
check
out |
done |
N |
| Ramp
Editor |
Steve
T, Todd, ... |
test |
done |
Y |
| Rhic
Chromaticity |
Steve
T |
test |
done |
N |
| DQmin |
Joanne |
test |
partly
done |
N |
| -> |
take out PLL,
Schottky was not updating, no scans done |
|||
| BERT |
Greg,
Seth |
test |
done |
N |
| RhicLumi |
Seth,
Angelika |
test |
done |
Y |
| Store
Automation |
Greg,
Angelika |
status? |
partly done |
N |
| -> |
done: start
collimation, gap cleaner, 10 Hz to do: start lisa from tape-sequencer, others? |
|||
| IR
Bump |
Fulvia,
Sev |
test |
done |
N |
| sequencer |
Ted, Jen, Todd, Molly, Nick K., ... | revisit |
mostly done |
Y |
| -> |
basic
sequences tested (Up, Down, Prep, Hysteresis) beam and pp related sequences were not tested transition timing for instrumentation to be done |
|||