    Nov. 20 




RHIC Dry Run (Nov 15-17)




Day 1 (AtR, Injection, general software)


System commissioner
comments
status
changes
Elog
Todd, Ila, Angelika
available? (yes) any new features? (yes)
done
N
AtR
Nick T., Woody ...
setpoints for Au, AtR managers, AtR orbit, BPMs, loss monitors, emittance measurements (automatic measurements, records?)
partly done
Y
->
new AtR manager was not ready for testing, testing was done with old manager, lattice matched to existing Au8 lattice
- automation of emittance measurements from AGS & AtR still going on


RHIC operations GPMs, StartUp
operations, Angelika, Greg
ramp, magnets, beam current, fill pattern, SpecMan, etc.
done
N
Logger
Roger L.
test
done
N
LogView
Ted
test
done
Y
Permit Link
Rob, operations
check out
done
N
Abort kickers
Leif, Arlene
check out
done
N
->
tested with ramping, abort kickers tested, working properly


Plotfill, FDAview
Todd
test
done
Y
BLAM
Jonathan, Greg, Leif
test
done
N
RHIC Injection
Wolfram, Arlene
event generation and detection, software changes?, check out
partly done
N
->
new version with Au parameters released, no further testing was done
Injection kickers tested, working properly, need to follow up with Wolfram


Sequencer
Ted, Jen, Todd, Molly, Nick K., ...
new C++ version, test
(see comments below, Day 3)
done
Y
tape
Jen
combined test w. sequencer, mode switching for dAu
done
Y
Configuration Control
Greg, Angelika
check status
not done
Y
->
use desired tunes in applications (BBQ, ARTUS, tune display ....)



 Day 2 (instrumentation)


System
commissioner
comments
status
changes
IPM
Roger C, Steve T
test application
done
N
WCM
Roger L
test, new scopes, ethernet
done
Y

WCM in general tested: working properly, new scopes are working
- some modification in labview code still to be done
- connection with tape-sequencer to get timing for transition-mode
- action item: new calibration factors need to be set (with beam!)



RHIC vacuum, pressure display
Dick H, Haixin, Seth
test (application)
not done
N
e- detectors
SY, Angelika, ...?
check out, test
not done
N
AC dipole
Mei
work test
done
N
transition monitor (button pickup)
Mike Blasko, Angelika, Roger L
test application
n.a.
Y
->
scope installed, connected to eathernet, data up-load time: approx. 2.5 min.
action items:
- locate hybrids, install
- finish cabling, matching, trigger cables
- OR box for blue/yellow triggers
- ADO design (pet page), for day 1: labview
- run analysis code on scope (likely with beam)



BPMs
Rob, Todd
managers, timing
partly done
Y
->
old managers only


Tune Meter (Artus)
Rob, Angelika, Jonathan
test new software
done
Y
Injection Damper
Rob, Angelika
check out
done
N
BBQ, feedback, transition monitor,
BTF
Pete C, Al, Carl, ...
test, check out
Pete
Y
->
done:
- BBQ functional, disable other devices tested
- chromaticity algorithm tested
- sign swap in chromaticity measurements fixed
- lock bit: implemented and operational (?)
- BTF application checked and operational
to do:
- Brho correction during the ramp
- feed forward application
- desired tune/chrom appl. : what is this?
- BTF appl.: calculate and show tune distribution
- lock bit: verify interface to sequencer
- feedback on the ramp operational?
- injection stabilization?


Schottky
Kevin, ...?
test
partly
done
N
->
small software changes still ongoing, no updates seen in DQmin


RF, applications
Tom H
check out
done
N
collimators
Angelika, Wenge
test, start from sequencer
partly
done
Y
->
action items:
- fix skew plane ADO home function (in progress)
- fix one motion driver (in progress)
- dedicated GPM for backgrounds (done)
- one limit switch flaky
- start from tape-sequencer (done)


gap cleaner
Angelika, Wenge
test, start from sequencer
partly
done
Y
->
10 Hz duty cycle tested, operational
action item: some small software changes in application to be done
start from tape-sequencer (done)


Tune Display
Dan
test
done
N
Loss Monitors &
Thresholds
Mei, Seth
RHIC, AtR, injection data
done
N
Jump Watch
Christoph
test
partly
done
N
10 Hz Feedback
Christoph,...
status?, check out
done
Y
polarimeter
Haixin, Seth, ...
test polarimeter hardware and software in case of pp
not done
Y
->
significant changes in server software, tested in AGS but not RHIC, hardware modifications (target holder) were still going on



                

   Day 3 (ramp, software, store)

System
Commissioner
comment
status
changes
Ramping systems
& online model
Al, Steve, Nikolay, Todd
WFG manager, online model ...
OrbitCalc, opticalc, online-offline interface ...
partly
done
Y
->
orbitcalc: new library (version V2)
feature: calculate tune shift from sextupoles after correction
opticalc: new version V2
implemented: b* matching, offline model interface (SXF)
to be done: new sextupole scheme



OrbitDisplay
Vadim
test (both versions)
done
Y
LISA
Ted, Angelika
test new features
partly done
Y
->
done: save configuration, stop update
action items: cross section calculation (in progress)


Orbit Correction
Nikolay, Vadim
test new version (see above)
done
Y
Skew Mod Yun
check out
done
N
Ramp Editor
Steve T, Todd, ...
test
done
Y
Rhic Chromaticity
Steve T
test
done
N
DQmin
Joanne
test
partly done
N
->
take out PLL, Schottky was not updating, no scans done


BERT
Greg, Seth
test
done
N
RhicLumi
Seth, Angelika
test
done
Y
Store Automation
Greg, Angelika
status?
partly
done
N
->
done: start collimation, gap cleaner, 10 Hz
to do: start lisa from tape-sequencer, others?



IR Bump
Fulvia, Sev
test
done
N
sequencer
Ted, Jen, Todd, Molly, Nick K., ... revisit
mostly
done
Y
->
basic sequences tested (Up, Down, Prep, Hysteresis)
beam and pp related sequences were not tested
transition timing for instrumentation to be done