RHIC Run-7 Dry Run Plan
*** DRAFT ***
    Nov. 13   

(based on similar plans for previous RHIC Runs)



RHIC Dry Run (Nov 15-17)

Schedule:
Wednesday Nov 15
9:00 am - 12:00 pm
1:30 pm - 5:00 pm
meeting  9:00 am in MCR
Thursday Nov 16
9:00 am - 12:00 pm
1:30 pm - 5:00 pm
meeting 9:00 am in MCR
Friday Nov 17
9:00 am - 12:00 pm
1:30 pm - 5:00 pm
meeting 9:00 am in MCR


Please check if:
- your name is assigned to the appropriate system
- your system is listed
- your system has or does not have changes (with respect to 2006)
- all appropriate names are associated with your system
- if you are available that day/time or need to switch to another day
- if you have enough time

green fields are AM, white fields are PM


Day 1 (AtR, Injection, general software)


System commissioner
comments
time
status
changes
Elog
Todd, Ila, Angelika
available? any new features?
9:15-9:30

N
AtR
Nick T., Woody ...
setpoints for Au, AtR managers, AtR orbit, BPMs, loss monitors, emittance measurements (automatic measurements, records?)
9:15-12:00

?
RHIC operations GPMs, StartUp
operations, Angelika, Greg
ramp, magnets, beam current, fill pattern, SpecMan, etc.
9:15-10:30

?
Logger
Roger L.
test
9:15-10:30

N
LogView
Ted
test
9:30-10:30

Y
Permit Link
Rob, operations
check out
10:00-11:00

N
Abort kickers
Leif, ...
check out
10:00-11:00

N
Plotfill, FDAview
Todd
test
10:30-12:00

Y
BLAM
Jonathan, Greg, Leif
test
11:00-12:00

?
RHIC Injection
Wolfram, ...
event generation and detection, software changes?, check out
1:30-2:30

N
Sequencer
Ted, Jen, Todd, Molly, Nick K., ...
new C++ version, test
1:30-4:00

Y
tape
Jen
combined test w. sequencer, mode switching for dAu
1:30-4:00

Y
Configuration Control
Greg, Angelika
check status
1:30-3:00

Y







 Day 2 (instrumentation)


System
commissioner
comments
time
status
changes
IPM
Roger C, Steve T
test application
9:15-10:30

?
WCM
Roger L
test, new scopes, ethernet
9:15-10:30

Y
RHIC vacuum, pressure display
Dick H, Haixin, Seth
test (application)
10:00-11:00

N
e- detectors
SY, Angelika, ...?
check out, test
11:00-12:00

?
AC dipole
Mei
work test
10:00-11:00

N
transition monitor (button pickup)
Mike Blasko, Angelika, Roger L
test application
10:00-11:00

Y
BPMs
Rob, Todd
managers, timing
10:30-12:00

Y?
Tune Meter (Artus)
Rob, Angelika, Jonathan
test new software
9:15-10:00

Y
Injection Damper
Rob, Angelika
check out
10:00-10:30

N
BBQ, feedback, transition monitor,
BTF
Pete C, Al, Carl, ...
test, check out
9:15-12:00

Y
Schottky
Kevin, ...?
test
1:30-2:30

?
RF, applications
Tom H
check out
1:30-2:30

?
collimators
Angelika, Wenge
test, start from sequencer
1:30-4:00

Y
gap cleaner
Angelika, Wenge
test, start from sequencer
1:30-4:00

Y
Tune Display
?
test
2:30-3:30

?
Loss Monitors &
Thresholds
Mei, Seth
RHIC, AtR, injection data
2:30-3:30

N
Jump Quads
Christoph
test
1:30-2:30

N
10 Hz Feedback
Christoph,...
status?, check out
2:30-3:30

Y
polarimeter
Haixin, Seth, ...
test polarimeter hardware and software in case of pp
2:30-4:00

Y

                

   Day 3 (ramp, software, store)

System
Commissioner
comment
time
status
changes
Ramping systems
& online model
Al, Steve, Nikolay, Todd
WFG manager, online model ...
OrbitCalc, online-offline interface ...
9:30-12:00

Y
OrbitDisplay
Vadim
test
9:15-10:30

?
LISA
Ted, Angelika
test new features
11:00-12:00

Y
Orbit Correction
Nikolay, Vadim
test (new features?), ramp correction ...
1:30-3:00

Y
Skew Mod Yun
check out
9:15-10:30

?
Ramp Editor
Steve T, Todd, ...
test
1:30-3:00

Y
Rhic Chromaticity
Steve T
test
3:00-4:00

?
DQmin
Joanne
test
10:00-11:00

?
BERT
Greg, Seth
test
1:30-2:30

N
RhicLumi
Seth, Angelika
test
2:30-3:00

Y
Store Automation
Greg, Angelika
status?
3:00-4:00

Y?
IR Bump
Fulvia, Sev
test
10:00-11:00

N
sequencer
Ted, Jen, Todd, Molly, Nick K., ... revisit
3:00-4:30

Y


please contact Angelika (drees@bnl.gov or x2348) for more information or comments.