(based on open items from previous Dry Run)
| Mon
Feb. 12 |
9:00 am - 12:00 pm |
1:30 pm - 5:00 pm |
meeting 9:00
am in MCR |
| Tues Feb. 13 |
9:00 am - 12:00 pm
|
1:30 pm - 5:00 pm |
meeting 9:00 am in
MCR |
Please check if:
DAY 1
| System |
commissioner |
comments |
time |
changes |
| WCM |
Roger L |
WCM in general
tested: working properly, new scopes
are working - some modification in labview code still to be done - connection with tape-sequencer to get timing for transition-mode - action item: new calibration factors need to be set (with beam!) |
9:15-10:30 |
Y |
| ARTUS |
Rob, Angelika,
Kerry |
test modified tune
ADO (frev calculation) -- done test for reflected pulse: - unlock PS for measurements (done) |
10:00-11:00 |
Y |
| DQmin |
Joanne |
take out PLL,
Schottky was not updating, no scans done (not done) |
10:00-11:00 |
Y |
| transition monitor
(button pickup) |
Mike Blasko,
Angelika,
Roger L |
scope installed,
connected to eathernet, data
up-load time: approx. 2.5 min. action items: - locate hybrids, install - finish cabling, matching, trigger cables (done) - OR box for blue/yellow triggers (done) - ADO design (pet page), for day 1: labview: labview exists, manager software needs to be done - run analysis code on scope (likely after beam) |
10:00-11:00 |
Y |
| BPMs |
Todd, Al |
new manager
software - manager software not yet tested |
10:30-12:00 |
Y |
| AtR | Nick T., Woody ... | new AtR manager
was not ready for testing last time, testing
was done with old manager, lattice matched to existing Au8 lattice. To
do: - check new magnet manager (any old Au file is sufficient) - automation of emittance measurements from AGS & AtR still going on |
10:00-11:30 |
Y |
| Schottky |
Kevin |
small software
changes still ongoing, no updates
seen in DQmin |
1:30-2:30 |
Y |
| collimators |
Angelika, Wenge |
action items: - fix skew plane ADO home function (done) - fix one motion driver (done) - dedicated GPM for backgrounds (done) - one limit switch flaky (done) - start from tape-sequencer (done) - fix mechanical problem in one vertical collimator (in progress) |
1:30-3:30 |
Y |
| gap cleaner |
Angelika, Wenge |
10 Hz duty cycle
tested, operational action item: some small software changes in application to be done (make 10 Hz operational) |
1:30-3:30 |
Y |
| Jump Watch |
Christoph |
done |
1:30-2:30 |
done |
| LISA |
Ted, Angelika |
action items:
cross section calculation |
3:30-4:30 |
Y |
| System | commissioner |
comments |
time |
changes/ status |
| Ramping Systems
& online model |
Al, Steve,
Nikolay, Todd |
orbitcalc:
new library (version V2) feature: calculate tune shift from sextupoles after correction opticalc: new version V2 implemented: b* matching, offline model interface (SXF) to be done: new sextupole scheme - test sextupole polarity check script |
9:15-12:00 |
|
| BBQ, feedback,
transition
monitor, BTF |
Pete C, Al, Carl, ... | to do: - Brho correction on the ramp - test of new tape sequences which make TF setup automatic * turning off ARTUS and IPM * automatically starting loggers * automatically correcting tune, coupling at the last stone - test of TF abort tape sequences - confirming that wfg manager sets quad, skew quad wfgs into proper mode for TF - ramp with simultaneous TF and chromaticity measurement (new radius modulating script) - test of feed forward application - test of BBQ ramp FFTs, display in MCR etc. (ADO?) |
9:15-4:30 |
|
| bunch-by-bunch
lumi monitoring |
Dan, Angelika |
check out
application - timing in of signals, hardware check still needs to be done with Hank from STAR and with beam! |
10:00-10:30 |
Y |
| e-detectors |
SY, ... |
check out, test monitors etc. | 11:00-12:00 |
N |
| RHIC Injection |
Wolfram, ... |
event generation
and
detection, software changes?, new version with Au parameters released, no further testing was done (Injection kickers already tested, working properly) |
1:30-2:30 |
Y |
| Sequencer |
Ted, Jen, Todd,
Molly,
Nick K., ... |
new C++ version: basic sequences already tested (Up, Down, Prep, Hysteresis) beam and pp related sequences were not tested transition timing for instrumentation to be done other? |
1:30-4:30 |
Y |
| tape |
Jen |
combined
test w. sequencer |
1:30-4:00 |
|
| store automation |
Greg, Angelika, Ted |
done:
start
collimation, gap cleaner, 10 Hz to do: start lisa from tape-sequencer, others? |
1:30-2:30 |
Y |
| Configuration
Control |
Greg, Angelika |
check status use in applications |
2:30-3:00 |
Y |
| RHIC Chromaticity
& Ramp Editor |
Steve, Ted |
implement 2nd and
3rd order chromaticity |
3:30-4:30 |
Y |