| Beam Experiment Proposal Listing |
|
|
|
|
|
|
|
| Version 05-02
(2005-3-11) |
|
|
|
|
2002-2003 Run record |
|
|
|
|
|
|
|
|
|
| Exp. No. |
Key words |
Spokesperson |
Class |
Priority |
Recommended |
Requested |
Status |
Record |
Class |
Priority |
Time used |
Recommended time |
Requested time |
|
|
|
|
time |
time |
|
|
|
|
|
|
|
|
|
|
[hour] |
[hour] |
|
|
[hour] |
[hour] |
|
| 03-01 |
Optics test with b*=0.5 m (pp at 100 GeV) |
Pilat |
1 |
A |
8 |
8 (p) |
proposed |
|
1 |
A |
0 |
8 |
8 (p) |
|
| 03-02 |
Diffusion measurements at injection |
Fliller |
|
|
completed |
PAC 2003 RPAG004 |
1 |
B |
|
2 |
1-2 |
|
| 03-03 |
Crystal Channeling at Injection |
Fliller |
|
|
completed |
PAC 2003 TPPB034 |
1 |
B |
|
2x2 |
1.5-2 |
|
| 03-04 |
Intrabeam scattering |
Fischer |
1 |
B |
3x1.5 |
3x1.5 |
running |
PAC2001 |
1 |
B |
2-3 |
3x2 |
3x2 |
|
| 03-05 |
Transverse echos |
Fischer |
1 |
B |
1+2 |
4 (p) |
completed |
|
1 |
B |
0 |
1+2 |
4 (p) |
|
| 03-06 |
Q` measurement via RF phase modulation and PLL |
Bruning, Tepikian |
1 |
B |
0 |
(2-8 static) + (4-8 ramp) |
proposed |
|
1 |
B |
0 |
|
(2-8 static) + (4-8 ramp) |
| 03-08 |
Electron cloud vs. injection pattern |
Fischer |
|
|
completed |
C-A/AP/118(2003) |
1 |
A |
|
3 |
3 |
|
| 03-09 |
Pressure rise in AtR |
Fischer |
1 |
C |
0 |
0 (parasitic to RHIC) |
proposed |
|
1 |
C |
0 |
0 |
0 (parasitic to RHIC) |
| 03-11 |
Tomographic measurement of alpha_1 |
Montag |
|
|
completed |
PAC2003 RPAG006 |
1 |
A |
|
3x1 |
3 ramps + (?) |
|
| 03-12 |
Suppression of synchrotron radiation |
Burkhardt, Pilat |
2 |
C |
3x2 |
3x(2-3) |
proposed |
|
2 |
C |
0 |
3x2 |
3x(2-3) |
|
| 03-13 |
RHIC electron cloud and vacuum pressure rise |
He |
0 |
|
3x2 |
completed |
PAC 2003 MOPA010 |
0 |
A |
8 |
3x2 |
3x2 |
|
| 03-14 |
Beam Scrubbing |
Huang |
0 |
|
during commission |
completed |
|
0 |
A |
8 |
8 |
during commission |
| 03-15 |
Triplet roll and gradient from Action- Phase |
Cardona |
|
|
completed |
PAC 2003 RPAG003 |
1 |
A/B |
|
1+2 |
1 per triplet |
|
| 03-16 |
Beam polarization profile measurement |
Huang |
1 |
A |
2 |
2 |
running |
|
1 |
A |
0 |
2 |
2 |
|
| 03-17 |
Sextupole calibration with Action-Phase |
Cardona |
|
|
completed |
PAC 2003 MOPA010 |
1 |
B |
|
1 |
1 |
|
| 03-18 |
Nonlinear Chromaticity |
Tepikian, Ptitsyn |
1 |
|
2 |
completed |
|
1 |
A |
6 |
2 |
2 |
|
| 03-20 |
AC dipole - coupling |
Bai |
1 |
|
32 |
completed |
PAC 2003 WPAB073 |
1 |
A |
5-6 |
3+2 |
32 |
|
| 03-21 |
AC dipole - optics |
Bai |
1 |
|
12-16 |
completed |
PAC 2003 WPAB072 |
1 |
A |
12-15 |
3+2 |
12-16 |
|
| 03-22 |
Incoherent tune spread of EC |
Zhang |
1 |
|
5 |
replaced by 04-24 |
1 |
|
0 |
|
5 |
|
| 03-23 |
Nonlinear resonances |
Ptitsyn |
1 |
? |
? |
2x(3 inj. + 3 top) |
running |
|
1 |
B |
6 |
3x3 |
2x(3 inj. + 3 top) |
|
| 03-24 |
Beam halo scraping and beam loss |
Ptitsyn |
1 |
|
3 |
completed |
|
1 |
A |
2 |
3 |
3 |
|
| 03-25 |
Stochastic cooling feasibility study |
Blaskiewicz, Brennan |
|
|
completed |
PAC 2003 WOAB005 |
1 |
A |
|
2x4 |
2x(4) + 2x(8) + |
|
| 03-26 |
Instabilities in RHIC |
Blaskiewicz |
|
|
completed |
PAC 2003 RPPB007 |
1 |
A |
|
0 |
0 (parasitic) |
|
| 03-27 |
Dynamic aperture at flattop |
Pilat |
1 |
B |
4 |
4 for every optics |
running |
|
1 |
B |
4-5 |
4 |
4 for every optics |
|
| 03-28 |
Solenoid effect on electron cloud |
Zhang |
? |
|
5 |
completed |
|
0 |
A |
3-4 |
1+2+2 |
5 |
|
| 03-29 |
Head-tail Q' measurement |
Cameron, Jones |
1 |
B |
? |
2-6 |
runnnig |
|
1 |
A |
parasitic |
2+2 |
2-6 |
|
| 03-30 |
Beam-beam emittance growth vs.
transverse offset |
Fischer |
1 |
A |
2x1 |
2x1 + 1 |
proposed |
|
1 |
A |
0 |
2x1 |
2x1 + 1 |
|
| 03-31 |
Beam-beam, long bunches &
large X-ing angle |
Fischer |
1 |
? |
? |
2x1 + 1 |
running |
|
1 |
A |
1-2 |
2x1 |
2x1 + 1 |
|
| 03-32 |
Beam-beam: coherent modes |
Fischer |
|
|
completed |
PAC 2003 TOAA011 |
1 |
B |
|
4+2 |
6 (p) |
|
| 03-33 |
Beam-beam resonance driving
terms |
Fischer |
1 |
B |
3 |
3 |
proposed |
|
1 |
B |
0 |
3 |
3 |
|
| 03-34 |
Lifetime and background vs.
working point |
Fischer |
|
|
completed |
PAC 2003 TOAA011 |
1 |
A |
|
3 |
3 |
|
| 03-35 |
Crystal channeling at flattop |
Fliller |
|
|
completed |
PAC 2003 TPPB034 |
1 |
B |
|
2 |
1 |
|
| 03-36 |
Diffusion at flattop |
Fliller |
|
|
completed |
PAC 2003 RPAG004 |
1 |
B |
|
2 |
2 |
|
| 03-37 |
Optics and transport for pp2pp |
Satogata, Guryn |
|
|
completed |
|
1 |
B |
|
2 |
during commissionig |
| 03-38 |
Optics test with b*=20 m (pp at
100 GeV) |
Tepikian, Guryn |
N/A |
|
8 |
proposed |
|
N/A |
|
|
|
8 |
|
| 03-39 |
Loss distribution from primary
collimators |
Drees |
|
|
completed |
|
0 |
A |
|
4 |
4 |
|
| 03-40 |
Interaction Region Correction |
Pilat |
1 |
A |
4 |
4 |
running |
PAC 2003 TPPB041 |
1 |
A |
4 |
4 |
4 |
|
| 03-41 |
Skew quadrupole modulation -
coupling |
Pilat |
N/A |
|
2 |
replaced by 04-10 |
1 |
B |
|
2 |
2 |
|
| 04-01 |
Measure of multipole strengths
from BPM data |
Tomas |
1 |
B |
3 |
2 shifts |
proposed |
|
|
|
|
2 shift1_shifts |
|
| 04-02 |
Skew chromaticity |
Tepikian |
1 |
B |
3 |
2 |
proposed |
|
|
|
2 |
|
| 04-03 |
Beam based prediction of
snapback |
Bottura, Pilat |
2 |
B |
2+2 |
4+4 |
proposed |
|
|
|
4+4 |
|
| 04-04 |
Schottky chromaticity |
Cameron |
1 |
A |
3 |
3 |
proposed |
|
|
|
3 |
|
| 04-05 |
PLL/Schottky coupling
measurement |
Cameron |
1 |
B |
2 |
1+1 |
proposed |
|
|
|
1+1 |
|
| 04-06 |
Non-linear tune spread |
Cameron |
1 |
A |
2 |
2 |
proposed |
|
|
|
2 |
|
| 04-07 |
Chromaticity feedback |
Cameron |
1 |
A |
3 |
1+1/2 |
proposed |
|
|
|
1+1/2 |
|
| 04-08 |
Instabilities in RHIC/impedance
measurement |
Blaskiewicz |
1 |
A |
2 |
2 |
proposed |
|
|
|
2 |
|
| 04-09 |
Stochastic cooling feasibility
study |
Blaskiewicz, Brennan |
1 |
A |
4 |
parasitic/hours |
proposed |
|
|
|
parasitic/hours |
|
| 04-10 |
Measure of coupling via skew
quad modulation |
Pilat, Luo |
1 |
B |
4 |
4+4 |
proposed |
|
|
|
4+4 |
|
| 04-11 |
Beta star measurement |
Pilat, Wittmer |
1 |
A |
4 |
4+8 |
proposed |
|
|
|
8+8 |
|
| 04-12 |
Pressure bump vs.pumping speed |
Thieberger |
1 |
A |
? |
? |
proposed |
|
|
|
? |
|
| 04-13 |
Tune scans at injection |
Tomas |
1 |
B |
2 |
2 |
proposed |
|
|
|
2 |
|
| 04-14 |
Beam scraping and pressure rise |
Huang |
0 |
A |
2+2 |
2+2 |
proposed |
|
|
|
|
|
| 04-15 |
Solenoid effect on RHIC electron
cloud |
Smart |
1 |
B |
2 |
2 |
proposed |
|
|
|
|
|
| 04-16 |
Nonlinear chromaticity |
Tepikian Ptitsyn |
1 |
B |
2 |
3 |
proposed |
|
|
|
|
|
| 04-17 |
Transition pressure rise vs.
bunch pattern |
Iriso |
1 |
A |
3 |
3 |
proposed |
|
|
|
|
|
| 04-18 |
Electron cloud characteristics |
Iriso |
1 |
B |
2 |
2 |
proposed |
|
|
|
|
|
| 04-19 |
Linear optics measurement and
correction |
Bai |
1 |
B |
2 |
8 |
proposed |
|
|
|
|
|
| 04-20 |
Coupling measurement with AC
dipole |
Bai |
1 |
C |
1+1 |
6 |
resubmitted |
|
|
|
|
|
| 04-21 |
Vacuum chracteristics of PR and
NEG pipes |
He |
1 |
A |
parasitic |
1+1 |
proposed |
|
|
|
|
|
| 04-22 |
Central frequency measurement |
Cameron |
1 |
A |
1+1 |
1+1 |
proposed |
|
|
|
|
|
| 04-23 |
Gas desorption from SS under
perp. beam impact |
Fischer |
1 |
A |
1 |
2 |
proposed |
|
|
|
|
|
| 04-24 |
Coherent and incoherent EC tune
shifts |
Luo, Cameron |
1 |
B |
parasitic |
|
proposed |
|
|
|
|
|
| 04-25 |
Tune Feedback |
Cameron |
1 |
B |
6 |
2x(3x1) |
proposed |
|
|
|
|
|
| 05-01 |
Transition Pressure Rise |
Ptitsyn |
0 |
B |
|
3+4 |
accepted |
instability study? 1B |
|
|
|
|
|
| 05-02 |
10 Hz beam jitter as function of
He flow |
Montag |
1 |
B |
2h @end |
0.5h |
accepted |
end of run |
|
|
|
|
|
| 05-03 |
Measurement and minimization of
local coupling at store using AC
dipoles |
Tomas |
1 |
B |
?? |
8h+8h |
needs resubmission |
|
|
|
|
|
| 05-04 |
Emittance measurement using
Schottky |
Bai, Kurt, Tepikian |
0+1 |
B |
(para)+2 |
2hx4 |
accepted |
|
|
|
|
|
| 05-05 |
Molecular desorption under
perpendicular impact |
Fischer |
2 |
B |
2 (Cu) +2 (p) |
2+2 |
accepted |
|
|
|
|
|
| 05-06 |
Transverse Echoes |
Fischer |
1 |
B |
3 (Cu)+3 (p) |
6h |
accepted |
|
|
|
|
|
| 05-07 |
Snake Resonance Spectrum |
Bai, Roser |
1 |
B |
4+4 (p) |
8 h x2 |
accepted |
|
|
|
|
|
| 05-08 |
Surviving electrons in gaps |
Drees, Jimenez |
1 |
(A) |
FY06 |
2x6h @ FY06 |
proposed |
waiting for CERN hardware |
|
|
|
|
|
| 05-09 |
10 Hz IR orbit feedback test |
Montag |
0 |
B |
2+2 |
4h |
accepted |
|
|
|
|
|
| 05-10 |
Emittance growth due to 10 Hz
beam jitter |
Montag |
1 |
A |
1+1 |
1 h x2 End of store |
accepted |
end of store |
|
|
|
|
|
| 05-11 |
Skew Quadrupole Modulations |
Luo, Pilat |
0 |
A |
2+2 |
1.5h x 3 |
accepted |
|
|
|
|
|
| 05-12 |
PLL phase loop test for global
decoupling |
Cameron, Luo |
1 |
B |
(para)+2 |
2hx4 |
accepted |
|
|
|
|
|
| 05-13 |
Transverse Impedance
Localization |
MacKay |
1 |
C |
3+3 |
3h x 2 rings |
proposed |
presentation needed; need
to link with 04-08 |
|
|
|
|
| 05-14 |
Characterization of Cold Bore
Pressure Rise |
Hseuh |
0 |
A |
2+2 (05-26) |
2hx4 |
accepted |
merge with 05-26 |
|
|
|
|
|
| 05-15 |
Beta star squeeze at store |
Pilat |
0 |
B |
2+2 (Cu) 2+2 (p) |
2hx4 |
accepted |
|
|
|
|
|
| 05-16 |
IP optics measurement |
Luo |
1 |
A |
(para) |
1.5h parasitic |
accepted |
|
|
|
|
|
| 05-17 |
Skew Chromaticity II |
Tepikian |
1 |
C |
2 |
2h |
accepted |
|
|
|
|
|
| 05-18 |
Suppression of transverse IBS |
Litvinenko |
0 |
C |
8hx2 |
5hx2 |
accepted |
more time likely needed |
|
|
|
|
|
| 05-19 |
Feasibility Study
of Beam-based Alignment in the |
Cameron, Kewish |
1 |
B |
2h |
2hx3 |
accepted |
|
|
|
|
|
| 05-20 |
Difference between coherent and
incoherent tune |
Cameron, Wilinski |
1 |
B |
(para) |
2hx3, with Schottky/IPM |
accepted |
|
|
|
|
|
| 05-21 |
High Frequency Schottky
Calibration |
Vetter |
0 |
B |
2h |
2h |
accepted |
link to 05-04 |
|
|
|
|
|
| 05-22 |
Evaluation of anti-grazing ridge |
Zhang |
1 |
B |
2+2 |
2hx4 |
accepted |
|
|
|
|
|
| 05-23 |
NEG pipe evaluation |
Huang |
1 |
A |
2hx4 |
2hx4 |
accepted |
|
|
|
|
|
| 05-24 |
beam scrubbing |
Huang |
1 |
C |
8h (p) |
8h, p |
accepted |
need to extend to cold section |
|
|
|
|
|
| 05-25 |
Compensation of the 3rd order
resonance at injection |
Pilat, Ptitsyn |
1 |
B |
3hx2 |
3hx2 |
accepted |
|
|
|
|
|
| 05-26 |
Evaluation of electron Cloud in
the RHIC arcs |
Iriso |
0 |
A |
(05-26) |
2h |
accepted |
merge with 05-14 |
|
|
|
|
|
| 05-27 |
Intrabeam scattering coupling
dependence |
Wei |
1 |
A |
6h |
6h |
accepted |
|
|
|
|
|
| 05-28 |
beam based alignment of
sextupole |
Satogata |
0 |
B |
2h |
4.5h |
accepted |
|
|
|
|
|
| 05-29 |
Long-range beam-beam effect at injection |
Fischer |
1 |
B |
3h |
3h |
accepted |
proton beam |
|
|
|
|
|
| 05-30 |
Maximum dynamic pressure estimate |
Fischer |
|
3h |
2h |
completed |
|
|
|
|
|
| 05-31 |
Loss Maps |
Drees |
1 |
A |
1h |
1h |
completed |
Cu beam |
|
|
|
|
|
| 05-32 |
Precision measurement of the optics and transport at IP2 |
Yip, Tepikian |
|
5h |
proposed |
needed precision? Presentation
needed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Notes: |
|
|
|
|
|
|
|
|
|
Class: |
|
|
|
|
0: likely to immediately benefit RHIC machine
performance, or crucial to RHIC hareware decision-making |
|
|
|
|
1: directly benefiting RHIC machine performance |
|
|
|
|
2: benefiting general community |
|
|
|
|
Priority: |
|
|
|
|
A: a) benefiting RHIC operation; b) well prepared;
and c) likely to succeed |
|
|
|
|
B: has at least two of the above three |
|
|
|
|
C: has at least one of the above three |
|
|
|
|
D: none of the above |
|
|
|
|
Recommended time: |
|
|
|
|
Status (determined after AEAC review of publications
and/or results): |
|
|
|
|
Completed: |
|
|
|
|
Partly completed/requireing more
time: |
|
|
|
|
Unlikely to succeed: |
|
|
|
|
Not ready: pending for hardware, software, or another experiments |
|
|
|
|
Ready: hardware/software ready for experiment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|