Noise Areas

BNL:  Departments  |  Science  |  ESSH  |  Newsroom  |  Administration  |  Visitors  |  Directory

 

Accelerator
ATS
Authorization
BNL Site Index
BTMS
Committees
Controls
Design Safety
Elec. Safety
EMS
ESF
ESH Phone
ESHQ SMD
ESSHQ C-AD
Home
LESHC
Operations
OPM
OSH
PPE
Rad. Safety
Safety
SBMS
Search OPM
Search Site
Site Map
Training

C-A Hearing Conservation Program

 

BUILDING

                  DESCRIPTION   

          Noise Source

NOISE

LEVEL

dBA

LAST SURVEY DATE

HEARING

PROTECTION

REQUIRED

901

TVDG Accelerator Room

Accelerator

78.4 – 85.4

2/21/06

Yes

901

TVDG Basement

Accelerator

76.2 –91.2

2/21/06

Yes

901

Mechanical Equipment Room

Norwalk Compressor On

 

 

Yes

901

Mechanical Equipment Room

Norwalk Compressor OFF

67.5 – 79.3

2-21-06

No

911

Pump Room

Pumps

79.1-93.6

4-10-06

Yes

911

ME Room Roof

Pumps

69.5 – 78.7

6/21/06

No

911

Westinghouse

MG

102-109.9

12/16/06

Yes

911

Westinghouse

Building

64.1 –92.3

12/16/06

Yes

912

Rect House #3

ERL Pumps

86.1 – 91.0

5/18/07

Yes

912A

Pump Room

Pumps

67.6 – 94.9

6/6/06

Yes

912A

Pump Room

Generator

 

 

Yes

914

Booster Pump Room

Pump

82.0 – 91.1

6/21/06

Yes

919A

Pump Room

Pump/Compressor

84.0-87,2

8/1/06

Yes

920

E-10 House

Rectifier House

73.5 – 82.5

6-25-07

No

925

Test Dock

Pumps

<85

12-20-06

No

927

ATR

Dehumidifier

< 85

5/31/06

No

928

MG Room

MG

94.5 – 99.0

6-7-06

Yes

928

Control, Computer, Rectifier, HV room

Electronics

< 85

6-7-06

No

928

Mezzanine

Mechanical Equipment

< 85

6-7-06

No

928

Basement

Pumps

80.2 – 90.7

6-7-06

Yes

929

RF 1st Floor Power Supply Room

Power Supply Room

62.0 – 86.1

6-7-06

Yes

929

RF 1st Floor Mechanical Equipment Room

Pumps

73.5 – 79.5

6-7-06

No

929

Mezzanine RF Center, Mechanical Room

Mechanical Equipment, PS

62.0 – 79.0

6-7-06

No

929

2nd Floor Tech Shop

 

55.5 – 70.5

6-7-06

No

930

LINAC Injection

Electronics

< 76.3

5/16/06

No

930

LINAC 1St Floor

Pumps

82.2 –88.5

3/21/06

Yes

930

LINAC 2nd Floor

Power Supply

< 78.9

5/16/06

No

930

LINAC Basement

Pumps

<74.0

5/16/06

No

930

LINAC Pump Room

Pumps

85.1 – 93.0

5/16/06

Yes

930A

Booster Power Supply

Power Supplies

69.8 – 85.2

5/16/06

Yes

932

F-10 House

Power Supplies

< 73.6

6-28-07

No

932

F-10 House

Pump Room

88.8- 94.5

6-28-07

Yes

957

NSRL Pump Room 1st Floor

Pump

88.2-92.4

6/8/06

Yes

957

NSRL Pump Room 2Nd Floor

Pump

86.8-87.9

6/8/06

Yes

957

NSRL Electronics Room 1st Floor

Power Supply

72.9-75.8

6/8/06

No

957

NSRL Electronics Room 2nd Floor

Power Supply

73.8-81.1

6/8/06

No

1000P

Mechanical Room

Pumps

76.2-85.9

6/5/06

Yes

1000P

Electronic Room

Power Supply

71.2-78.3

6/5/06

No

1002A

Utility Room/Machine Support

Electronics

<75.3

5/23/06

No

1002A

BRAHMS Pump Room 1st Floor

Pump

87.4-96.9

5/23/06

Yes

1002B

BRAHMS Pump Room 2nd Floor

Pump

88.2-90.7

5/23/06

Yes

1002B

Valve Box Area

Local to Compressor

83.7-88.4

5/23/06

Yes

1004

RHIC Tunnel  RF Area

Cooling Water Pumps

 <85

11-16-06

No

1004

RHIC Tunnel  RF Area (on floor)

Filament Blowers On

82.3 – 92.7

11-16-06

Yes

1004

RHIC Tunnel  RF Area (on platforms) 

Filament Blowers On

82.3 – 98.5

11-16-06

Yes

1004A

Pump Room

Pumps

82.9 – 86.3

5-23-06

Yes

1004A

Power Units, Tech Lab

Electronics Racks

<73.2

5-23-06

No

1004B

Operation Area

Electronics Racks

64.6 – 87.1

5-27-06

Yes

1005E

RHIC Cryogenic Support

Sullair Compressor

79.9 – 93.6

1-10-06

Yes

1005H

Cryogenic Compressor Room

Full Operation

101.2-108.5

3-20-06

Yes

1005H

Cryogenic Compressor Room

Utility Compressor Operation

84.2 – 98.1

11-1-06

Yes

1005P

Mechanical Equipment Room

Pumps/Compressor

< 83.6

6-5-06

No

1005R

Cryogenic Refrigeration Room

Cryogenic Equipment

83.9-94.9

5-4-06