Official copies of these procedures are maintained at this website.    Before using a printed copy, verify that it is the most current  version by checking the document issue date on this website.  Signed copies of these official procedures are maintained at the Training Office. 

 

Return to Table of Contents

 

Procedure No.

Procedure Title

Author

Revision No.

Date

7.1.1

Operations Shift Turnover 

Anthony Nicoletti

04

06/09/04

7.1.2

Compressor Room - Vacuum System Operation 

Dewey Lederle

03

01/22/07

7.1.4

Compressor Room - Heat Exchanger Skid Operation

Edward Quimby

02

08/02/04

7.1.5

Compressor Room - Water System Operation 

Edward Quimby

02

08/02/04

7.1.5.a

Cooling Water Requirements

Edward Quimby

02

08/02/04

7.1.6

Compressor Room - First Stage Compressor Operation

Chris Salat

03

01/22/07

7.1.6.a

Initial Valve Configuration

Edward Quimby

01

08/02/04

7.1.7

Compressor Room - Second Stage  Compressor Operation

Chris Salat

03

01/22/07

7.1.7.a

Valve Tables

Edward Quimby

01

08/02/04

7.1.8

Compressor Room - Redundant Compressor Operation

Chris Salat

03

01/22/07

7.1.8.a

Initial Valve Tables

Edward Quimby

01

08/23/04

7.1.9

Compressor Room - Utility Compressor Operation

Edward Quimby

04

02/22/07

7.1.9.a

Valve Configuration for Utility Compressor Purge

Edward Quimby

01

08/23/04

7.1.10

Compressor Room - Oil Recovery System Operation

Dewey Lederle

04

02/22/07

7.1.10.a

Equipment Protective Interlocks

Edward Quimby

01

08/23/04

7.1.10.b

Initial Valve Configuration

Edward Quimby

01

08/23/04

7.1.11 

25 kW Helium Refrigerator Cooldown

Chris Salat

05

09/19/07

7.1.11.a

Valve Position Tables

Chris Salat

05

09/19/07

7.1.12

Compressor Room - Oil Processing System Operation

Frank Cullen

03

01/22/07

7.1.13

25 kW Helium Refrigerator Scrub

Dewey Lederle

02

08/24/04

INACTIVE

7.1.13.a

Refrigerator Scrub Valve Lineup

Dewey Lederle

02

08/24/04

INACTIVE

7.1.14

RHIC Ring Scrub

Anne Reuter

00

05/31/00

INACTIVE

7.1.14.a

RHIC Ring Scrub Valve Lineup

Anne Reuter

00

05/31/00

INACTIVE

7.1.15

Heat Exchanger 1A/2A Online and Heat Exchanger 1B/2B Offline

Dewey Lederle

04

08/31/04

7.1.16

Heat Exchanger 1B/2B Online and Heat Exchanger 1A/2A Offline

Dewey Lederle

04

08/31/04

7.1.17

Regeneration of Heat Exchanger 1A/2A

Dewey Lederle

04

06/09/08

7.1.18

Regeneration of Heat Exchanger 1B/2B

Dewey Lederle

05

06/09/08

7.1.19

Adsorber Bed A Online and Adsorber Bed B Offline

Dewey Lederle

04

08/31/04

7.1.20

Adsorber Bed B Online and Adsorber Bed A Offline Procedure

Dewey Lederle

04

08/31/04

7.1.21

Regeneration of Adsorber Bed A

Dewey Lederle

03

06/09/08

7.1.22

Regeneration of Adsorber Bed B

Dewey Lederle

03

06/09/08

7.1.23

Seal Gas Compresor Start-Up

Lou Tenreiro

03

10/23/07

7.1.24

Cold Expander Purge Procedure 

Dewey Lederle

01

  04/24/06

7.1.25

Liquid Storage Cooldown and Fill Procedure

Dewey Lederle

02

09/19/07

7.1.26

Expander Brake System Installation and Removal

Thomas Wozniak

03

01/22/07

7.1.27

Warm Expander Purge Procedure

Dewey Lederle

03

04/24/06

7.1.28

Compressor Room - Cryogenic Purifier Operation

Mark Sardzinsky

03

01/22/07

7.1.29

Insulating Vacuum System #1 for Cold Boxes 1 and 2

Dewey Lederle

02

01/22/07

7.1.30

Insulating Vacuum System #2 for Adsorber Beds A and B

Dewey Lederle

02

01/22/07

7.1.31

Insulating Vacuum System #3 for Cold Boxes 3 and 4

Dewey Lederle

02

02/22/07

7.1.32

Insulating Vacuum System #4 for Cold Box 5

Dewey Lederle

02

01/22/07

7.1.33

Insulating Vacuum System #5 for Turbine Pods 3, 4, 5 and 6

Dewey Lederle

02

01/22/07

7.1.34

Insulating Vacuum System #6 for Turbine Pods 1 and 2

Dewey Lederle

02

01/22/07

7.1.35

Reactivation of Regeneration System

Mark Sardzinski

03

01/15/08

7.1.36

Regeneration System Normal Operation

Mark Sardzinski

02

01/22/07

7.1.37

System Restart Following a Momentary Loss of Power

Chris Salat

02

08/08/07

7.1.38

RHIC Warm-Up

Dewey Lederle

00

09/09/05

7.1.39

Cryogenic Group Lockout/Tagout

Andy Warkentien

04

09/04/08

7.1.39.a

Cryo LOTO Logbook Format

Dewey Lederle

02

01/22/07

7.1.39.b

Cryogenic Group Shift Supervisor LOTO Sheet

Dewey Lederle

02

01/22/07

7.1.39.c

Cryogenic Group Shift Supervisor LOTO Sheet Continuation Form

Dewey Lederle

02

01/22/07

7.1.40

Warm Turbines "A"Train Initialization

Louis Tenreiro

05

04/11/08

7.1.41

Warm Turbines "B" Train Initialization

Louis Tenreiro

05

04/11/08

7.1.42

Cold Turbines "A" Train Initialization

Louis Tenreiro

05

04/11/08

7.1.43

Cold Turbines "B" Train Initialization

Louis Tenreiro

05

04/11/08

7.1.44

Warm Turbines "A" Train Online and "B" Train Offline

Dewey Lederle

02

08/31/04

7.1.45

Warm Turbine "B" Train Online and "A" Train Offline

Dewey Lederle

02

08/31/04

7.1.46

Cold Turbine "A" Train Start Up After Unscheduled Shutdown of "B" Train

Chris Salat

00

10/14/05

7.1.47

Cold Turbine "B" Train Start Up After Unscheduled Shudown of "A" Train

Chris Salat

00

10/14/05

7.1.48

Shutdown of the Warm Turbine Oil Skids

Louis Tenreiro

02

04/28/08

7.1.49

Shutdown of the Cold Turbine Oil Skids

Chris Salat

00

10/14/05

7.1.50

Purge of Warm Expander Inlet Filter

Dewey Lederle

00

09/13/04

7.1.51

Purge of the Cold Expander Inlet Filter

Chris Salat

00

10/21/05

7.1.52

RHIC Warm-Up / Transition to 80K Cooler

Dewey Lederle

00

07/06/07

7.1.53

RHIC Ring Pre-Cool Via Heat Shield Supply

Dewey Lederle

01

09/13/04

INACTIVE

7.1.53.a

Valve Position Tables

Dewey Lederle

01

09/13/04

INACTIVE

7.1.57

Regeneration of Warm Turbines "A" Train

Dewey Lederle

02

06/25/08

7.1.58

Regeneration of Warm Turbines "B" Train

Dewey Lederle

02

06/25/08

7.1.59

Regeneration of Cold Turbines "A" Train

Dewey Lederle

02

06/25/08

7.1.60

Regeneration of Cold Turbines "B" Train

Dewey Lederle

02

06/25/08

7.1.61

Operations Call In

Dewey Lederle

02

09/22/06

7.1.62

Oil Injected Screw Compressors - General Maintenance for Periods of Inactivity

Viorel Badea

01

01/22/07

7.1.63

Replacement of Burst Disks During Operation

Anthony Nicoletii

02

06/02/06

7.1.64

Inspection/Testing Cryogenic System Relief Devices

Anthony Nicoletti

01

03/23/05

7.1.65

Preparation for Personnel Entry of RHIC
Helium Refrigerator Vacuum Tanks at    Bldg. 1005S and the Valve Box Vacuum Tanks in Bldg. 1002B, 1004B, 1006B, 1008B, 1010A and 1012A

Asher Etkin

01

06/19/06

7.1.65.a

Safety Issues Associated with Cold Box 3

Mark Sardzinski

01

03/04/05

7.1.65.b

Safety Issues Associated with the 6 O'Clock Yellow Valve Box

Mark Sardzinski

01

05/03/05

7.1.65.c

Safety Issues Associated with Cold Boxes 1 & 2

Mark Sardzinski

00

03/04/05

7.1.65.d

Safety Issues Associated with Cold Box 4 of the RHIC 24 kW Refrigerator

Mark Sardzinski

00

03/18/05

7.1.65.f

Safety Issues Associated with the 2 O'Clock Yellow Valve Box

Mark Sardzinski

00

06/03/05

7.1.65.g

Safety Issues Associated with the 2 O'Clock Blue Valve Box

Mark Sardzinski

00

06/03/05

7.1.65.h

Safety Issues Associated with the 4 O'Clock Yellow Valve Box

Mark Sardzinski

00

06/03/05

7.1.65.i

Safety Issues Associated with the 4 O'Clock Blue Valve Box

Mark Sardzinski

00

06/03/05

7.1.65.j

Safety Issues Associated with the 8 O'Clock Yellow Valve Box

Mark Sardzinski

00

06/03/05

7.1.65.k

Safety Issues Associated with the 8 O'Clock Blue Valve Box

Mark Sardzinski

00

06/03/05

7.1.65.l

Safety Issues Associated with the 10 O'Clock Yellow Valve Box

Mark Sardzin